Site Final | 8/12/2009 | 8/12/2009 | 8/12/2009 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Eric Strole
|
|
|
|
Random Inspection | 6/11/2009 | 6/11/2009 | 6/11/2009 | A | PART |
Jim Storey
|
|
|
work slow site ok
|
General Inspection | 5/18/2009 | 5/18/2009 | 5/18/2009 | A | PART |
Dixie Fellows
|
|
|
SITE CLEAN EXCEPT FOR BIG TRENCH BEING DUG FOR INTERMOUTAIN GAS TO LAY THE MAIN LINE
|
General Inspection | 4/29/2009 | 4/29/2009 | 4/29/2009 | A | PART |
Mike Kinnear
|
|
|
sign not post site ready for surfacing
|
General Inspection | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 1/28/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | PASS |
Mike Kinnear
|
|
|
sign posted di drains installed, concrete wash site done, & site looks fine
|
Site Preparation | 11/7/2008 | 11/7/2008 | 11/7/2008 | | NR |
Clint A Smith
|
|
|
|