Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC08-00716
StatusFinaled
Name KORRY HOLDEN
Site Address 6753 W OVERLAND RD
Project Name 
Customer Number 
ePlanReview 
Description
DEMO ONLY, DOES NOT INCLUDE CONSTRUCTION
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/6/200811/6/200811/7/2008APASS
DetailsClint A Smith
BMP Violation10/30/200811/3/200811/3/2008APASS
DetailsClint A Smith
set up perimeter sediment controls on all sides of the project.
BMP Violation10/30/200810/30/200810/30/2008PFAIL
DetailsClint A Smith
Spoke with RP and told him prior to getting a site final he would need to stabilize all the disturbed area of the demo project and if it is not complete by Friday in the PM, he would need to install a sediment barrier along the east side of the lot. Will re-inspect in on 11/3/08 AM
Site Final10/22/200810/22/200810/22/2008AFAIL
DetailsClint A Smith
Lot has not been stabilized with either a sprayed tachifier seed mix or a BFM or 2" wash rock over the entire lot. Left a message with the RP the proceedure to reach final stabilzation.
General Inspection9/9/20089/12/20089/12/2008AFAIL
DetailsClint A Smith
Notice of Correction
1. Re-install silt fence per manufactor specs.
2. Additional sediment bmp's are needed along the east side of the lot.
3. Protect storm drain inlet in the driveway at the east side of the project with approved drain inlet protection.
Failure to comply will result in a stop work order.
Wil re-inspect on 9/16/08
CAS
Site Preparation9/9/20089/9/20089/9/2008APART
DetailsClint A Smith
Site looks good. Told RP that the need to re-istall the silt fence per manufactor specs if they will be using or go to an alternative bmp. Wil re-inspect on 9/12/08
CAS