Site Final | 3/8/2010 | 3/8/2010 | 3/8/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 10/5/2009 | 10/5/2009 | 10/5/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | CANC |
Tom Arcoraci
|
|
|
|
General Inspection | 5/4/2009 | 5/4/2009 | 5/4/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 4/30/2009 | 4/30/2009 | 4/30/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 | P | PASS |
Clint A Smith
|
|
|
No issues with any sediment on the asphalt.
|
Tracking Control | 2/18/2009 | 2/23/2009 | 2/23/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all hard surface of all sediment and debris. Clean all spoil pile of excess conrete and dispose of in a proper manor. Will re-inspect on 2/23/09.
|
Random Inspection | 2/11/2009 | 2/11/2009 | 2/11/2009 | P | PART |
Tom Arcoraci
|
|
|
|
General Inspection | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
BMP Violation | 1/21/2009 | 1/23/2009 | 1/23/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 1/15/2009 | 1/21/2009 | 1/21/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: 1.Install wattles per industry standards. 2. Clean up allsediment off of hard surfaces. Will re-inspect on 1/23/09 AM
|
BMP Violation | 1/12/2009 | 1/15/2009 | 1/15/2009 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: the way that the wattle is staked inplace, you use a twine to keep it sitting down into the trach. Or re-stake it through the center of the wattle. Also clean up all sediment off of the hard surfaces on a daily basis. Will re-inspect on 1/21/09AM.
|
General Inspection | 1/12/2009 | 1/12/2009 | 1/12/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal Notice: (left a message with the RP) 1. Install a sediment barrier along Irving St. due the the slope of disturbed area and have disturbed the vegitative buffer. Also recommended a covering of plastic over stockpile prior to any storm events that may occur if the piles are still present. Will re-inspect on 1/15/09
|
General Inspection | 12/17/2008 | 12/17/2008 | 12/17/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 12/3/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/25/2008 | 11/25/2008 | 11/25/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/25/2008 | 11/25/2008 | 11/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 11/14/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/18/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | PASS |
Clint A Smith
|
|
|
Actual work will not start until 11/17/08. Will re-inspect on 11/18/08.
|
Site Preparation | 11/13/2008 | 11/13/2008 | 11/13/2008 | P | CANC |
Clint A Smith
|
|
|
10:00am
|
Site Preparation | 11/13/2008 | 11/13/2008 | 11/13/2008 | | NR |
Clint A Smith
|
|
|
|