Site Final | 7/21/2009 | 7/21/2009 | 7/21/2009 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 7/13/2009 | 7/13/2009 | 7/13/2009 | P | PASS |
Bob Reichert
|
|
|
looks ok, landscaping not done
|
Random Inspection | 7/9/2009 | 7/9/2009 | 7/9/2009 | A | PASS |
Bill VanDegrift
|
|
|
looks good
|
Random Inspection | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PART |
Jim Storey
|
|
|
|
General Inspection | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Troy James
|
|
|
site looks good
|
BMP Violation | 3/12/2009 | 3/16/2009 | 3/16/2009 | A | PART |
Clint A Smith
|
|
|
all issues taken care of. Just need to pick up excess wood that is on the the sidewalk.
|
Complaint Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice To RP: 1. Clean up all hardsurfaces of all sediment and debris. 2. Provide a washout pit of futere washout needs. 3. Provide a trash debris container for all trash debris on site. Also clean up all trash debris on site and properly dispose of. Failure to comply will result inn a stop work order. Will re-inspect on 3/16/09 AM.
|
Tracking Control | 2/24/2009 | 2/26/2009 | 2/27/2009 | P | PASS |
Eric Strole
|
|
|
|
Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to clean all concrete spoils, dirt & debris off all hard surfaces, install wattle or trench in front of lot if over 2% & install a concrete wash out by 2-26-09 pm.
|
Site Preparation | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | FAIL |
Jim Sly
|
|
|
Verbal corr. to RP..............Clean up all hard surfaces.....Need straw waddle or trench at front sidewalk area.
|
Tracking Control | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PASS |
Eric Strole
|
|
|
|
Tracking Control | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to clean up tracking, dirt & debris off all hard surfaces by days end due to possible rain events. will reinspect 2-11-09 am
|
Random Inspection | 2/4/2009 | 2/4/2009 | 2/4/2009 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 1/28/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Jim Storey
|
|
|
|
Tracking Control | 1/14/2009 | 1/16/2009 | 1/16/2009 | P | PART |
Clint A Smith
|
|
|
Spoke with contactor to clean up sediment off of sidewalk by the end of the day.
|
General Inspection | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP: Clean up all hard surfaces of any sediment and debris on a daily basis. Will re-inspect on 1/16/09 PM
|
Site Preparation | 12/22/2008 | 12/22/2008 | 12/22/2008 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | CANC |
Clint A Smith
|
|
|
Wrong address
|
General Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PART |
Steven Webb
|
|
|
Demo completed, wattle in place on down slope. Minor amount of concrete debris remains on site. Site has not been stabilized.
|
Site Preparation | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | FAIL |
James Rogers
|
|
|
No Site stabilization in place.
|
BMP Violation | 9/8/2008 | 9/9/2008 | 9/9/2008 | A | PASS |
Clint A Smith
|
|
|
Hillside perimeter controls in place.
|
BMP Violation | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | FAIL |
Clint A Smith
|
|
|
Need to install perimeter bmp's at the back of lot. Was told by the RP that will be completed by the end of the day. CAS
|
Site Preparation | 9/5/2008 | 9/5/2008 | 9/5/2008 | | PART |
Clint A Smith
|
|
|
No work has begun but sign is posted. CAS
|