Permit Information
Permit NumberESC08-00736
StatusFinaled
Name GARY SCHACHER
Site Address 3418 E SWEETWATER DR
Project Name 
Customer Number 
ePlanReview 
Description
Clean up and demo after fire
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/21/20097/21/20097/21/2009PPASS
DetailsJim Storey
General Inspection7/13/20097/13/20097/13/2009PPASS
DetailsBob Reichert
looks ok, landscaping not done
Random Inspection7/9/20097/9/20097/9/2009APASS
DetailsBill VanDegrift
looks good
Random Inspection4/21/20094/21/20094/21/2009PPART
DetailsJim Storey
General Inspection4/14/20094/14/20094/14/2009PPASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection3/27/20093/27/20093/27/2009PPASS
DetailsTroy James
site looks good
BMP Violation3/12/20093/16/20093/16/2009APART
DetailsClint A Smith
all issues taken care of. Just need to pick up excess wood that is on the the sidewalk.
Complaint Inspection3/12/20093/12/20093/12/2009AFAIL
DetailsClint A Smith
Correction Notice To RP:
1. Clean up all hardsurfaces of all sediment and debris.
2. Provide a washout pit of futere washout needs.
3. Provide a trash debris container for all trash debris on site. Also clean up all trash debris on site and properly dispose of.
Failure to comply will result inn a stop work order. Will re-inspect on 3/16/09 AM.
Tracking Control2/24/20092/26/20092/27/2009PPASS
DetailsEric Strole
Tracking Control2/24/20092/24/20092/24/2009PFAIL
DetailsEric Strole
left verbal correction with rp to clean all concrete spoils, dirt & debris off all hard surfaces, install wattle or trench in front of lot if over 2% & install a concrete wash out by 2-26-09 pm.
Site Preparation2/18/20092/18/20092/18/2009PFAIL
DetailsJim Sly
Verbal corr. to RP..............Clean up all hard surfaces.....Need straw waddle or trench at front sidewalk area.
Tracking Control2/10/20092/11/20092/11/2009APASS
DetailsEric Strole
Tracking Control2/10/20092/10/20092/10/2009PFAIL
DetailsEric Strole
left verbal correction with rp to clean up tracking, dirt & debris off all hard surfaces by days end due to possible rain events. will reinspect 2-11-09 am
Random Inspection2/4/20092/4/20092/4/2009APASS
DetailsJim Storey
Random Inspection1/28/20091/28/20091/28/2009APASS
DetailsJim Storey
Tracking Control1/14/20091/16/20091/16/2009PPART
DetailsClint A Smith
Spoke with contactor to clean up sediment off of sidewalk by the end of the day.
General Inspection1/14/20091/14/20091/14/2009PFAIL
DetailsClint A Smith
Verbal correction to RP:
Clean up all hard surfaces of any sediment and debris on a daily basis.
Will re-inspect on 1/16/09 PM
Site Preparation12/22/200812/22/200812/22/2008 PASS
DetailsClint A Smith
General Inspection12/10/200812/10/200812/10/2008PCANC
DetailsClint A Smith
Wrong address
General Inspection9/23/20089/23/20089/23/2008PPART
DetailsSteven Webb
Demo completed, wattle in place on down slope. Minor amount of concrete debris remains on site. Site has not been stabilized.
Site Preparation9/17/20089/17/20089/17/2008PFAIL
DetailsJames Rogers
No Site stabilization in place.
BMP Violation9/8/20089/9/20089/9/2008APASS
DetailsClint A Smith
Hillside perimeter controls in place.
BMP Violation9/8/20089/8/20089/8/2008PCANC
DetailsClint A Smith
Site Preparation9/8/20089/8/20089/8/2008PFAIL
DetailsClint A Smith
Need to install perimeter bmp's at the back of lot. Was told by the RP that will be completed by the end of the day.
CAS
Site Preparation9/5/20089/5/20089/5/2008 PART
DetailsClint A Smith
No work has begun but sign is posted.
CAS