Permit Information
Permit NumberESC08-00737
StatusFinaled
Name NICK VOTH
Site Address 3392 E SWEETWATER DR
Project Name 
Customer Number 
ePlanReview 
Description
Clean up and demo after fire/ to construct new single family dwelling.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/11/20096/11/20096/11/2009APASS
DetailsJim Storey
General Inspection4/30/20094/30/20094/30/2009APASS
DetailsMike Kinnear
sign posted sign almost completed looks fine
General Inspection4/21/20094/21/20094/21/2009PPART
DetailsEric Strole
landscape work going on at this time, they will clean at the end of each day.
General Inspection3/18/20093/18/20093/18/2009PPASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection3/17/20093/17/20093/17/2009PPART
DetailsJim Storey
looks ok at this time
Random Inspection3/13/20093/13/20093/13/2009PPART
DetailsJim Storey
looks ok
General Inspection3/11/20093/11/20093/11/2009PPASS
DetailsMike Kinnear
site looks fine sign posted
Random Inspection3/9/20093/9/20093/9/2009APASS
DetailsTroy James
site looks good
BMP Violation2/25/20092/26/20092/27/2009APASS
DetailsEric Strole
General Inspection2/26/20092/26/20092/26/2009APART
DetailsMike Kinnear
sign posted site looked fine snow
BMP Violation2/25/20092/25/20092/25/2009AFAIL
DetailsEric Strole
left verbal coccection with rp to clean up all trash on site by 2-26-09 am.
Tracking Control2/10/20092/11/20092/11/2009APASS
DetailsEric Strole
BMP Violation2/6/20092/10/20092/10/2009PFAIL
DetailsEric Strole
left verbal correction with rp to clean up tracking, dirt & debris off all hard surfaces by days end due to possible rain events. will reinspect 2-11-09 am. bmp violation on installing wattles is complete.
BMP Violation2/6/20092/6/20092/6/2009AFAIL
DetailsClint A Smith
Spoke with RP aand told him to re-install new wattles along the lot to the west where they destroyed them. Told him this will be his final notice and that a stop work order will beplaced on his project if not correct by 2/9/08 PM. Inspector #380 will-reinspect on 2/10/09 PM.
BMP Violation1/26/20091/28/20091/28/2009ADONE
DetailsClint A Smith
Will re-inspect on 1/30/09.
BMP Violation1/23/20091/26/20091/26/2009APART
DetailsClint A Smith
Moved to 1/28/09
BMP Violation1/20/20091/23/20091/23/2009PFAIL
DetailsClint A Smith
Moved to 1/26/09 due to the freeze.
Tracking Control1/14/20091/20/20091/20/2009PFAIL
DetailsClint A Smith
Left a Message with RP
Final Notice:
To re-install a new sediment barrier where the excavators distroyed the one installed previously.
Will re-inspect on 1/23/09.
Tracking Control1/12/20091/14/20091/14/2009AFAIL
DetailsClint A Smith
(Via phona call to RP)
Notice of Correction:
1. Clean all sediment and debris off of all hard surfaces at project lot and to the west to the half court.
2. Clean up concrete washout spoil pile on lot to the west and provide a concrete washout pit for any further concrete pours.
Will re-inspect on 1/20/08 PM
Tracking Control1/9/20091/12/20091/12/2009AFAIL
DetailsClint A Smith
Did address the issues prior but told RP to do a better job byv scraping and sweeping up sidewalks and gutterpans. Also told the RP to install a sediment barrier at the lot to the west due to the disturbance of the vegitative buffer and the slope. Will re-inspect on 1/14/09
Site Preparation1/9/20091/9/20091/9/2009APART
DetailsClint A Smith
Cleaned up hardsurfaces from yesterday. Have generated minor amount of tracking and sediment on the hard surfaces. Was told by the contractor that at the end of the day, all hardsurfaces will be cleaned up.
Will re-inspect on 1/12/09.
Tracking Control1/7/20091/8/20091/8/2009AFAIL
DetailsClint A Smith
Talk with RP and also the dirt workers.
Prior to any storm event or end of the day to clean all hard surface of all sediment and debris. Will re-inspect 1/9/09.
Tracking Control1/7/20091/7/20091/7/2009AFAIL
DetailsClint A Smith
Need to clean up all sediment from from the off haul of the stock pile. Left a message withthe RP of the project. Will re-inspect on 1/8/09
General Inspection1/2/20091/5/20091/5/2009APASS
DetailsClint A Smith
BMP Violation12/30/20081/2/20091/2/2009AFAIL
DetailsClint A Smith
Need to clean up sidewalks of all sediment and debris. Will re-inspect on 1/5/08
General Inspection12/29/200812/30/200812/30/2008AFAIL
DetailsClint A Smith
Talk to dirt contractors to clean up all sediment off of all hard surfaces. Also need to provide a trash enclosure for all solid waste generated from the project. Will re-inspect on 1/2/09.
General Inspection12/29/200812/29/200812/29/2008ACANC
DetailsClint A Smith
Wrong Date.
BMP Violation12/16/200812/18/200812/18/2008PFAIL
DetailsClint A Smith
Due to the conrete pour, excessive corncrete was spilled into the street and residuel was found in the gutter pan. Contacted the RP and told him to have it cleaned up immeadiately. Knife River came out and cleaned up to the best that they could out of the gutter pan and off of the street.
Random Inspection12/17/200812/17/200812/17/2008PPASS
DetailsJim Storey
BMP Violation12/11/200812/16/200812/16/2008AFAIL
DetailsClint A Smith
Left a message with RP.
1. Re-install or use another bmp that will aduately work correctly.
2. Clean up all tracking and figure out a way to prevent tracking. Have completed by 12/18/08 AM. Will re-inspect on 12/18/08 PM.
Random Inspection12/12/200812/12/200812/12/2008PPASS
DetailsJim Storey
Conference12/10/200812/11/200812/11/2008AFAIL
DetailsClint A Smith
Vebal correction to RP. Install a sediment and erosion products along the slope area where no protection is installed. Clean all hard surface of all sediment debris at the end of each working day. Provide an approved concrete washout prior to pour. Will re-inspect on 12/16/08.
Site Preparation11/18/200811/18/200811/18/2008PFAIL
DetailsClint A Smith
Told to retaining wall company that a construction entrance is required for there work. They hae until 11/19/08 to have one installed. Will re-inspect on 11/19/08 Pm
General Inspection9/23/20089/23/20089/23/2008PPART
DetailsSteven Webb
Informed contractor that wattle should be installed on property that work is being performed not on Ada County property. Stabilization not completed.
BMP Violation9/5/20089/8/20089/8/2008APASS
DetailsClint A Smith
Site Preparation9/5/20089/5/20089/5/2008 FAIL
DetailsClint A Smith
Silt fence is still not installed correctly. Gave the rp the specs on how to install the bmp's correctly and alternative ideas of other bmp's that can be used. Also need to clean up ALL hard surfaces at the end of the day, everyday.
Will re-inpsect on 9/8/08.
Site Preparation9/4/20089/4/20089/4/2008PFAIL
DetailsClint A Smith
Nee to re-install silt fence at the slope.
CAS