Site Final | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Bill VanDegrift
|
|
|
all done
|
Random Inspection | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Clint A Smith
|
|
|
No activity and no threat seen.
|
General Inspection | 1/21/2009 | 1/26/2009 | 1/26/2009 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Need to clean up all hard surfaces of all sediment and debris. Also make sure valley gutters are also cleared. Will re-inspect on 1/26/09
|
Random Inspection | 12/19/2008 | 12/19/2008 | 12/19/2008 | A | DONE |
Clint A Smith
|
|
|
No activity.
|
BMP Violation | 12/11/2008 | 12/15/2008 | 12/15/2008 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/11/2008 | 12/11/2008 | 12/11/2008 | P | FAIL |
Clint A Smith
|
|
|
Need to provide sediment protection on stock pile prior to 12/12/08 PM. Will re-inspect on 12/15/08 AM
|
General Inspection | 12/3/2008 | 12/5/2008 | 12/5/2008 | P | PASS |
Clint A Smith
|
|
|
No tracking present onto Cassia. Site looks good
|
Complaint Inspection | 12/3/2008 | 12/3/2008 | 12/3/2008 | A | FAIL |
Clint A Smith
|
|
|
spoke with the RP over the issue of tracking and we came up with a plan on how deal with any tracking off of the project area. Will re-inspect on 12/5/08
|
BMP Violation | 12/1/2008 | 12/2/2008 | 12/2/2008 | A | PART |
Clint A Smith
|
|
|
Minor trash clean up around the project area.
|
General Inspection | 11/28/2008 | 12/1/2008 | 12/1/2008 | A | FAIL |
Clint A Smith
|
|
|
Spoke with the General Contractor (C&A Paving to protect 2 storm drains and to protect any stock pile staged on the asphalt where any run off could reach any storm drains. Will re-inspect 12/2/08
|
Site Preparation ESC | 11/5/2008 | 11/5/2008 | 11/5/2008 | | PASS |
Clint A Smith
|
|
|
All work in the back of building.
|