DOC - Permit Finaled | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/7/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
James Rogers
|
|
|
|
Site Preparation | 10/1/2008 | 10/7/2008 | 10/7/2008 | A | PASS |
James Rogers
|
|
|
|
General Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | CANC |
Steven Webb
|
|
|
Wrong entry
|
Site Preparation | 9/11/2008 | 9/19/2008 | 9/19/2008 | A | PART |
Clint A Smith
|
|
|
Neec to protect the storm drains within the parking lot of the building. CAS
|
Site Preparation | 9/11/2008 | 9/11/2008 | 9/11/2008 | | NR |
Clint A Smith
|
|
|
Work will not be starting until next week. Will re-inspect on 9/19/08
|