Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberESC08-00779
StatusFinaled
Name JERRY HINE
Site Address 1105 N 13TH ST
Project NameNorth Jr. High School - add.
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/15/200910/16/200910/16/2009APASS
DetailsTony Young
General Inspection6/30/20096/30/20096/30/2009PPASS
DetailsBob Reichert
looked ok, appears that they sweep daily for tracking
Tracking Control5/11/20095/12/20095/12/2009PPASS
DetailsDixie Fellows
follow up for tracking on 15th
Random Inspection5/11/20095/11/20095/11/2009PFAIL
DetailsDixie Fellows
per dixie ...talked to rp about trucks tracking mud and dirt on 15th..he will have it swept up by tues am
General Inspection4/14/20094/14/20094/14/2009PPASS
DetailsPat Lass
looks ok
Tracking Control4/9/20094/10/20094/10/2009APART
DetailsClint A Smith
Rp shut down entrance and locked it up for no access. Will be installing rock on the section between the sidewalk and gutterpan once the weather permits.
Complaint Inspection4/9/20094/9/20094/9/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all tracking onto the street and add additional rock at the seperated sidewalk.
Will re-inspect on 4/10/09AM
General Inspection3/27/20093/31/20094/1/2009APASS
DetailsClint A Smith
Random Inspection3/27/20093/27/20093/27/2009APART
DetailsClint A Smith
Verbal to RP:
1. Prior to next pour date, re-establish the concrete washout pit.
2. Clean all sediment from the valley gutter by the end of the end of the day.
Will re-inspect on 3/31/09AM.
Random Inspection3/13/20093/16/20093/16/2009APASS
DetailsDixie Fellows
looks clean
Random Inspection3/13/20093/13/20093/13/2009ADONE
DetailsDixie Fellows
duplicate
General Inspection3/13/20093/13/20093/13/2009PPASS
DetailsDixie Fellows
ok
General Inspection3/13/20093/13/20093/13/2009APASS
DetailsPat Lass
looks ok
Random Inspection3/12/20093/12/20093/12/2009APASS
DetailsDaryl Spivey
Random Inspection2/23/20092/23/20092/23/2009PPASS
DetailsClint A Smith
Random Inspection1/5/20091/5/20091/5/2009APASS
DetailsClint A Smith
Tracking Control12/30/200812/30/200812/31/2008PPASS
DetailsTony Young
BMP Violation12/12/200812/15/200812/15/2008PPASS
DetailsClint A Smith
Site Preparation12/12/200812/12/200812/12/2008 FAIL
DetailsClint A Smith
Vebal Correction to RP.
Clean all hard surfaces of all sediment and debris.
Install a sediment barrier along drainage swale where the disturbed soil in either under 3ft away or right to it.
Sweep up all sediment and debris from the drainage swale throughout the school to the storm drain inlet. Will re-inspect on 12/15/08.
BMP Violation12/8/200812/9/200812/9/2008APASS
DetailsClint A Smith
Site Preparation12/8/200812/8/200812/8/2008AFAIL
DetailsClint A Smith
Need to protect all storm drain intlets. Post ESC sign at front of entrance of project area. Will re-inspect 12/9/08 AM.