Site Final | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/19/2008 | 9/26/2008 | 9/26/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | PASS |
Steven Webb
|
|
|
Mainly scope of work at inspection was preparation for work. Installation of scaffolding. Internal storm drains were bagged. Will follow up
|