Site Final | 5/28/2009 | 5/28/2009 | 5/28/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 5/13/2009 | 5/13/2009 | 5/13/2009 | A | PASS |
Dixie Fellows
|
|
|
nick is the contact...site is clean
|
Random Inspection | 4/16/2009 | 4/16/2009 | 4/16/2009 | A | PASS |
Bob Reichert
|
|
|
sign up, looked ok
|
Random Inspection | 2/17/2009 | 2/17/2009 | 2/17/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 2/12/2009 | 2/12/2009 | 2/12/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PART |
Tom Arcoraci
|
|
|
notified rp to sweep track out
|
BMP Violation | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted. Contractor is sweeping trackout on daily basis. Noted to contractor that it would be benificial for him to place a waddel to eliminate a majority of the tracout.
|
Site Preparation | 10/6/2008 | 10/6/2008 | 10/6/2008 | P | FAIL |
Jim Sly
|
|
|
Called RP.....left Mssg......Sweep street and Gutter.
|