DOC - Permit Finaled | 3/15/2010 | 3/15/2010 | 3/15/2010 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 3/18/2009 | 3/19/2009 | 3/19/2009 | A | PASS |
Dixie Fellows
|
|
|
doing alot of dirt work but keeing thes site clean
|
Random Inspection | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PEND |
Dixie Fellows
|
|
|
WILL RE-CHECK TOMORROW
|
Complaint Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Need to install perimeter protection on front of the unfinished driveway.
|
General Inspection | 3/5/2009 | 3/5/2009 | 3/5/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 3/3/2009 | 3/3/2009 | 3/3/2009 | A | PASS |
Pat Lass
|
|
|
looks ok
|
Random Inspection | 1/27/2009 | 1/27/2009 | 1/27/2009 | A | PASS |
Daryl Spivey
|
|
|
|
Random Inspection | 1/15/2009 | 1/19/2009 | 1/20/2009 | A | PASS |
Daryl Spivey
|
|
|
site good,....ds
|
Random Inspection | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PART |
Daryl Spivey
|
|
|
Needs trash picked up and area around lot cleaned up..............will check back in 2 working days......1/19/09.......ds
|
Random Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PASS |
Pat Lass
|
|
|
looks good
|
BMP Violation | 11/26/2008 | 12/1/2008 | 12/1/2008 | A | PASS |
Clint A Smith
|
|
|
Provided a trailer instead of a a trash container.
|
General Inspection | 11/26/2008 | 11/26/2008 | 11/26/2008 | A | FAIL |
Clint A Smith
|
|
|
Verbal Correction: 1.Clean all hard surfaces of all sediment and debris. 2. Provide a trash container 3. Maintain sediment barriers along the west end of lot. Will re-inspet on 12/1/08
|
Tracking Control | 11/10/2008 | 11/12/2008 | 11/12/2008 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 11/10/2008 | 11/10/2008 | 11/10/2008 | A | FAIL |
Clint A Smith
|
|
|
Spoke with RP. Maintain all perimeter BMP's. Install per- industry standards. Maintain D.I. at the bottom of the srteet. Will re-inspect on 10/12/08 AM
|
Site Preparation | 11/6/2008 | 11/7/2008 | 11/7/2008 | P | CANC |
Tony Young
|
|
|
|
General Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Pat Lass
|
|
|
site looks ok
|
Site Preparation | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | PART |
Tony Young
|
|
|
will need a clean out area,, garage ok for now,, will go back in a couple days
|