Site Final | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 10/9/2008 | 10/10/2008 | 10/10/2008 | P | PASS |
Steven Webb
|
|
|
Double drop inlet protection in place. Site looks good.
|
Site Preparation | 10/9/2008 | 10/9/2008 | 10/9/2008 | A | FAIL |
Clint A Smith
|
|
|
Verbal Notice Protect storm drains thruogh out the whole project area with approved internal protection and in addition, all drains must have an external protection also. Wil re-inspect tomorrow 10/10/08 in the PM.
|