Site Final | 12/9/2008 | 12/9/2008 | 12/9/2008 | A | PASS |
Clint A Smith
|
|
|
Left in one storm drain inlet protection at the north east end of project due to the future project that will be occuring once permit are going to be issued.
|
Random Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | P | DONE |
Clint A Smith
|
|
|
Left a message with RP to contact me over if the project is complete and to go over the requirments to pass for a site final.
|
General Inspection | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 10/27/2008 | 10/27/2008 | 10/27/2008 | A | PART |
Mike Kinnear
|
|
|
no sign posted site looks fine
|
Site Preparation ESC | 10/23/2008 | 10/23/2008 | 10/23/2008 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | PASS |
Steven Webb
|
|
|
Permit issued, rock entrance in place, sign posted and d.i. protected. Stop work lifted.
|