Aging Inspection | 10/6/2010 | 10/6/2010 | 10/6/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 7/10/2009 | 7/22/2009 | 7/22/2009 | A | NR |
Clint A Smith
|
|
|
|
Site Final | 7/8/2009 | 7/10/2009 | 7/13/2009 | P | NR |
Tony Young
|
|
|
ruston Phone #: ###-####
|
Site Final | 7/2/2009 | 7/8/2009 | 7/8/2009 | A | NR |
Tony Young
|
|
|
ruston Phone #: ###-#### wip
|
Random Inspection | 7/2/2009 | 7/2/2009 | 7/6/2009 | P | PASS |
Tony Young
|
|
|
ruston Phone #: ###-####
|
General Inspection | 7/2/2009 | 7/2/2009 | 7/2/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, prepping for sod, told rp to keep sign posted
|
General Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | PART |
Jim Sly
|
|
|
Talked to RP....need to replace filter in drain at street corner.
|
Random Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | A | PASS |
Dixie Fellows
|
|
|
SITE IS CLEAN
|
General Inspection | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | PASS |
Bob Reichert
|
|
|
called rp to post sign, not leave on roadway, rest looked ok
|
General Inspection | 5/12/2009 | 5/13/2009 | 5/13/2009 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/11/2009 | 5/12/2009 | 5/12/2009 | A | CANC |
Clint A Smith
|
|
|
scheduled for 5/13/09.
|
Site Preparation | 5/11/2009 | 5/11/2009 | 5/11/2009 | P | FAIL |
Tony Young
|
|
|
same as 460 notes,, wip on pit,, will be done prior to pouring ftgs
|
Site Preparation | 5/11/2009 | 5/11/2009 | 5/11/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Provide a concrete washout prior to the pour of any concrete. 2. install a sediement barrier along irragation canal at the east side of lot. If it is going to be piped in, contact the city over water deversion issues.
|