Site Final | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Mike Kinnear
|
|
|
site looks fine
|
General Inspection | 12/30/2008 | 12/30/2008 | 12/30/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 11/18/2008 | 11/18/2008 | 11/18/2008 | A | PART |
Tom Arcoraci
|
|
|
told rp keep construction debris in dumpster
|
General Inspection | 11/17/2008 | 11/17/2008 | 11/17/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 10/16/2008 | 10/16/2008 | 10/16/2008 | A | PART |
Mike Jordan
|
|
|
ESC permit sign posted. Dumpster has been provided. Needs to provide di protection by stemwalll placement.
|
General Inspection | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PART |
Clint A Smith
|
|
|
In the process of cleaning up all sediment off of all hard surfaces.
|
Site Preparation | 10/15/2008 | 10/15/2008 | 10/15/2008 | | FAIL |
Clint A Smith
|
|
|
Need to provide the ESC sign and contact the Erosion Control Dept over the details over the project issues. Will re-inspect on 10/17/08
|