Site Final | 12/12/2008 | 12/12/2008 | 12/12/2008 | P | PASS |
Mike Jordan
|
|
|
All work is completed. 70 % reveg has been achieved.
|
General Inspection | 12/10/2008 | 12/10/2008 | 12/10/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Final | 12/10/2008 | 12/10/2008 | 12/10/2008 | P | NR |
Mike Jordan
|
|
|
|
Random Inspection | 11/18/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/17/2008 | 11/17/2008 | 11/17/2008 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. Dumpster in place. general site conditions were good.
|
Site Preparation | 10/20/2008 | 10/27/2008 | 10/27/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/20/2008 | 10/20/2008 | 10/20/2008 | | NR |
Clint A Smith
|
|
|
No work has begun yet. Will check on 10/27/08.
|
Site Preparation | 10/13/2008 | 10/13/2008 | 10/14/2008 | A | PART |
Mike Jordan
|
|
|
ESC permit sign posted. Nees to sweep gutter pan and provide di protection. Verbal c/n given to RP. Needs to be completed by stemwall placement.
|