Permit Information
Permit NumberESC08-00885
StatusFinaled
Name JAMES LARKIN
Site Address 8904 W SHOUP DR
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 3 Building 13
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/30/20094/30/20094/30/2009APASS
DetailsMike Jordan
DOC - Permit Finaled4/30/20094/30/20094/30/2009PPASS
DetailsMike Jordan
Final stabalization is now completed. 70% reveg. ok.
Site Final4/29/20094/29/20094/29/2009PFAIL
DetailsMike Jordan
Final stabalization is not completed.
General Inspection4/29/20094/29/20094/29/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection4/29/20094/29/20094/29/2009APASS
DetailsJim Johnson
Random Inspection4/20/20094/20/20094/20/2009PPASS
DetailsMike Jordan
Random Inspection4/3/20094/3/20094/3/2009APASS
DetailsMike Jordan
General Inspection4/1/20094/1/20094/1/2009PPASS
DetailsMike Jordan
ESC permit sign posted. All BMP's in place. Site was clean.
General Inspection3/31/20093/31/20093/31/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection3/27/20093/27/20093/27/2009PPASS
DetailsJim Johnson
Tracking Control3/26/20093/26/20093/26/2009APASS
DetailsMike Jordan
All trackout is removed. Street is clean.
Tracking Control3/24/20093/24/20093/24/2009APART
DetailsMike Jordan
Contractor is sweeping on an as needed basis. Trackout is still somewhat excessive. Noted to RP that subs will have to comply or a stop work will be issued.
Tracking Control3/23/20093/23/20093/23/2009PFAIL
DetailsMike Jordan
Noted excessive trackout onto shoup. Needs to sweep all sediments off street. Verbal c/n given to RP.
Random Inspection3/16/20093/16/20093/16/2009PPASS
DetailsMike Jordan
Tracking Control3/5/20093/5/20093/5/2009PPASS
DetailsMike Jordan
Tracking Control3/4/20093/4/20093/4/2009PPART
DetailsMike Jordan
Contractor has swept street on as needed basis to keep track out to a minimum. Sub contractor that made the track out is completed with work and will not need to cross soup with heavy equipment for this phase of the project. General contractor noted that in future their will be a wheel wash area at a controlled point to avoid trackout in the future.
Tracking Control3/3/20093/3/20093/3/2009PFAIL
DetailsMike Jordan
Due to rain storms and heavy equipement going from paved unpaved to paved areas, trackout has increased and is at an unaceptable level. James Larkin (rp) has been contacted. Needs to hace all trackout cleaned up by end of day.
Random Inspection3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
Random Inspection2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
General Inspection2/26/20092/26/20092/26/2009PPASS
DetailsMike Jordan
ESC permit sign posted, BMP's in lace. General site conditions were clean.
Random Inspection2/12/20092/12/20092/12/2009PPART
DetailsMike Jordan
Needs to sweep sidewalk of all sediments.
Random Inspection2/5/20092/5/20092/5/2009APASS
DetailsJim Johnson
site look,s clean stockpiles been removed BMP in place sign posted
BMP Violation1/27/20091/29/20091/29/2009APASS
DetailsClint A Smith
All issues taken care of.
BMP Violation1/28/20091/28/20091/28/2009PPART
DetailsMike Jordan
wip on cleaning sidewalks and gutterpans.
Random Inspection1/27/20091/27/20091/27/2009PFAIL
DetailsMike Jordan
Needs to clean sidewalks and gutter pan. Gave RP verbal notice.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left message with RP.
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Install a stabilized construction entrance to lots.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
Site Preparation1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
ESC permit sign posted, BMP's in place. Due to wet weather contractor is sweeping at end of work.