Permit Information
Permit NumberESC08-00886
StatusFinaled
Name JAMES LARKIN
Site Address 8910 W SHOUP DR
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 2 Building 13
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/21/200910/21/200910/21/2009PPASS
DetailsClint A Smith
Random Inspection6/15/20096/15/20096/15/2009APASS
DetailsMike Jordan
Final stabalization has been completed. BMP's still in place due to subdivision construction. Will final when Bldg. finals.
Random Inspection4/20/20094/20/20094/20/2009PPASS
DetailsMike Jordan
Random Inspection4/3/20094/3/20094/3/2009APASS
DetailsMike Jordan
General Inspection4/1/20094/1/20094/1/2009PPASS
DetailsMike Jordan
ESC permit sign posted. All BMP's in place. Site was clean.
General Inspection3/31/20093/31/20093/31/2009PPASS
DetailsBob Reichert
looked ok
Tracking Control3/26/20093/26/20093/26/2009APASS
DetailsMike Jordan
All trackout is removed. Street is clean.
Tracking Control3/24/20093/24/20093/24/2009APART
DetailsMike Jordan
Contractor is sweeping as needed. Trackout is still excessive. Noted to RP that subs must comply or stop work order will be issued.
Tracking Control3/23/20093/23/20093/23/2009PFAIL
DetailsMike Jordan
Noted excessive trackout onto shoup. Needs to sweep all sediments off street. Verbal c/n given to RP.
Random Inspection3/16/20093/16/20093/16/2009PPASS
DetailsMike Jordan
Tracking Control3/5/20093/5/20093/5/2009PPASS
DetailsMike Jordan
Tracking Control3/4/20093/4/20093/4/2009PPART
DetailsMike Jordan
Contractor has cleaned trackout and is sweeping as needed to keep trackout at a minimum. Sub contractor who caused the excessive trrackout is completed with work for this phase. Per contractor, no heavy equipment should not need to cross soup street any longer and a wheel wash will be set up if needed in the future to avoid the trackout.
Tracking Control3/3/20093/3/20093/3/2009PFAIL
DetailsMike Jordan
Due to rain and heavy equipement going from paved to unpaved areas, trackout is excessive and at an unacceptable level. James lLarkin (rp) has been contacted and needs to have trackout cleaned up by end of day.
Random Inspection3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
Random Inspection2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
General Inspection2/26/20092/26/20092/26/2009PPASS
DetailsMike Jordan
ESC permit sign posted, all BMP's in place. General site conditions were clean.
Random Inspection2/12/20092/12/20092/12/2009PPART
DetailsMike Jordan
Needs to sweep sidewalk of all sediments. Verbal c/n given to RP.
Random Inspection2/5/20092/5/20092/5/2009APASS
DetailsJim Johnson
stockpiles from water and sewer excavation have been removed site look,s clean BMP in place sign posted
BMP Violation1/27/20091/29/20091/29/2009APASS
DetailsClint A Smith
All issues taken care of.
BMP Violation1/28/20091/28/20091/28/2009PPART
DetailsMike Jordan
wip on cleaning sidewalks and gutterpans.
Random Inspection1/27/20091/27/20091/27/2009PFAIL
DetailsMike Jordan
Needs to clean sidewalks and gutterpan. Gave RP verbal c/n.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left message with RP.
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Install a stabilized construction entrance to lots.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
BMP Violation1/27/20091/27/20091/27/2009PCANC
DetailsClint A Smith
Site Preparation1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
ESC permit sign is posted, BMP's in place. Due to wet weather, contractor is sweeping at end of work.