Permit Information
Permit NumberESC08-00888
StatusFinaled
Name JAMES LARKIN
Site Address 8916 W SHOUP DR
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 1 Building 13
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/17/20096/17/20096/17/2009PPASS
DetailsMike Jordan
DOC - Permit Finaled6/17/20096/17/20096/17/2009PPASS
DetailsMike Jordan
Final stabalization has been completed.
General Inspection5/8/20095/8/20095/8/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection4/29/20094/29/20094/29/2009APASS
DetailsJim Johnson
Random Inspection4/20/20094/20/20094/20/2009PPASS
DetailsMike Jordan
Random Inspection4/3/20094/3/20094/3/2009APASS
DetailsMike Jordan
General Inspection4/1/20094/1/20094/1/2009PPASS
DetailsMike Jordan
ESC permit sign posted. All BMP's in place. Site was clean.
General Inspection3/31/20093/31/20093/31/2009PPASS
DetailsBob Reichert
looked ok
Tracking Control3/26/20093/26/20093/26/2009APASS
DetailsMike Jordan
All trackout is removed. Street is clean.
Tracking Control3/24/20093/24/20093/24/2009APART
DetailsMike Jordan
Contractor is sweeping as needed. Noted that trackout is still somewhat excesive. Noted to RP that subs need to comply or a stopwork will be issued.
Tracking Control3/23/20093/23/20093/23/2009PFAIL
DetailsMike Jordan
Noted excessive trackout onto shoup. Needs to sweep all sediments of street. Verbal c/n given to RP.
Random Inspection3/16/20093/16/20093/16/2009PPASS
DetailsMike Jordan
Tracking Control3/5/20093/5/20093/5/2009PPASS
DetailsMike Jordan
Tracking Control3/4/20093/4/20093/4/2009PPART
DetailsMike Jordan
Contractor has swept trackout and is sweeping as needed to keep trackout at a minimum. A wheel wash out at a control piont will be set up in future if equipment needs to cross soup st. to avoid trackout.
Tracking Control3/3/20093/3/20093/3/2009PFAIL
DetailsMike Jordan
Due to rain and heavy equipement going from unpaved to paved areas, track out is excessive and has reached an unacceptable level. Contacted James Larkin (rp) to notify him of situation. Must be cleaned up by days end.
Random Inspection3/2/20093/2/20093/2/2009PPASS
DetailsMike Jordan
Random Inspection2/27/20092/27/20092/27/2009PPASS
DetailsMike Jordan
General Inspection2/26/20092/26/20092/26/2009PPASS
DetailsMike Jordan
ESC permit sign posted, all BMP's in place. General site conditions were good.
Random Inspection2/12/20092/12/20092/12/2009PPART
DetailsMike Jordan
Needs to sweep sidewalk of all sediments. Verbal c/n given to RP.
Random Inspection2/5/20092/5/20092/5/2009APASS
DetailsJim Johnson
site look,s clean stockpiles from water and sewer excavation have been removed BMP in place sign posted
BMP Violation1/27/20091/29/20091/29/2009APASS
DetailsClint A Smith
All issues taken care of.
BMP Violation1/28/20091/28/20091/28/2009PPART
DetailsMike Jordan
wip on cleaning sidewalks and gutterpans.
Random Inspection1/27/20091/27/20091/27/2009PFAIL
DetailsMike Jordan
Needs to clean sidewalks and gutterpan. Gave RP verbal c/n.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left message with RP.
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Install a stabilized construction entrance to lots.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
Site Preparation1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
ESC permit sign is posted. BMP's in place. Due to wet weather, contractor is sweeping at days end after work is complete.