Permit Information
Permit NumberESC08-00890
StatusFinaled
Name JAMES LARKIN
Site Address 566 S BLUE PINE LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 3 Building 14
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled6/4/20096/4/20096/4/2009PPASS
DetailsClint A Smith
Random Inspection4/21/20094/21/20094/21/2009PPASS
DetailsMike Jordan
General Inspection4/6/20094/6/20094/6/2009PPART
DetailsSteven Webb
Verbal to rp; general cleanup, stabilze bare ground, debris management.
Random Inspection3/18/20093/18/20093/18/2009PPASS
DetailsMike Jordan
BMP Violation3/13/20093/13/20093/13/2009APASS
DetailsMike Jordan
General Inspection3/11/20093/11/20093/11/2009PPART
DetailsMike Jordan
Needs to pick up const. debries and sweep sediments from street, gutterpan and sidewalks. Verbal c/n given to rp.
General Inspection3/10/20093/10/20093/10/2009PPASS
DetailsBob Reichert
looked ok
BMP Violation2/23/20092/23/20092/23/2009PPASS
DetailsMike Jordan
BMP Violation2/20/20092/20/20092/20/2009PPART
DetailsMike Jordan
Significant progress has been made on cleanup. Needs to pickup all const. debries.
BMP Violation2/19/20092/19/20092/19/2009PFAIL
DetailsMike Jordan
Needs to sweep all sediment from sidewalk, street and gutterpans. Verbal c/n given to RP.
Tracking Control2/19/20092/19/20092/19/2009APASS
DetailsMike Jordan
Tracking Control2/18/20092/18/20092/18/2009PPART
DetailsMike Jordan
Track out is minimal, contractor is sweeping on daily basis and as needed.
Tracking Control2/17/20092/17/20092/17/2009PPASS
DetailsMike Jordan
Random Inspection2/11/20092/11/20092/11/2009PPASS
DetailsMike Jordan
Random Inspection2/10/20092/10/20092/10/2009PPASS
DetailsMike Jordan
Random Inspection2/3/20092/3/20092/3/2009PPASS
DetailsJim Johnson
sign posted exteral protection installed on storm drain stockpile has been removed
BMP Violation1/27/20091/29/20091/29/2009APART
DetailsClint A Smith
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
Site Preparation1/22/20091/22/20091/22/2009PPASS
DetailsMike Jordan
ESC permit sign posted. ok.
Site Preparation1/21/20091/21/20091/21/2009APART
DetailsMike Jordan
All BMP's in place. GAve RP verbal c/n to [post ESC signs.