Permit NumberESC08-00898
StatusFinaled
Name JAMES LARKIN
Site Address 8867 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 1 Building 16
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/21/200910/21/200910/21/2009PPASS
DetailsClint A Smith
General Inspection10/12/200910/12/200910/12/2009PPASS
DetailsBob Reichert
looked ok
BMP Violation3/23/20093/23/20093/23/2009PPASS
DetailsMike Jordan
All issues resolvd. ok
General Inspection3/20/20093/20/20093/20/2009PPASS
DetailsBob Reichert
looked ok
General Inspection3/20/20093/20/20093/20/2009PPART
DetailsMike Jordan
ESC permit sign posted, BMP's in place. Needs to finish picking up cinst. debries and sweep all sediments of off har surfaces.
Site Preparation3/20/20093/20/20093/20/2009PCANC
DetailsMike Jordan
Random Inspection3/13/20093/13/20093/13/2009PPASS
DetailsJim Johnson
Random Inspection3/2/20093/2/20093/2/2009APASS
DetailsMike Jordan
Random Inspection2/25/20092/25/20092/25/2009APASS
DetailsMike Jordan
Tracking Control2/24/20092/24/20092/24/2009APASS
DetailsMike Jordan
BMP Violation2/20/20092/20/20092/20/2009APART
DetailsMike Jordan
Contracotr has made significant progress on clean p. did note some conc. in gutterpan that needs to be swept and also needs to cleanup const. debries.
BMP Violation2/19/20092/19/20092/19/2009AFAIL
DetailsMike Jordan
Needs to sweep all sediments off streets, sidewalks and gutterpans. Verbal c/n given to RP.
Tracking Control2/18/20092/18/20092/18/2009PPART
DetailsMike Jordan
Trackout kept to a minimum. Contractor is sweeping as needed and daily.
Tracking Control2/17/20092/17/20092/17/2009PPASS
DetailsMike Jordan
New BMP's installed as per revised and approved esc plan, trackout is minimal, contractor is sweeping as needed and on a daily basis.
Random Inspection2/12/20092/12/20092/12/2009PPASS
DetailsMike Jordan
Random Inspection2/10/20092/10/20092/10/2009PPASS
DetailsJim Johnson
signage in place new BMP installed entrance and exit sign to project in place
Tracking Control2/3/20092/3/20092/3/2009APASS
DetailsMike Jordan
Tracking Control1/29/20091/29/20091/29/2009PPART
DetailsMike Jordan
Contractor has made significant progresss in clean up. wip. Noted the contractor has hired ground effects, they were replacing di protection and providing waddels.
Random Inspection1/28/20091/28/20091/29/2009PPART
DetailsMike Jordan
Needs to scrap dried sediment from sidewalk and gutterpan.
BMP Violation1/23/20091/23/20091/23/2009PPASS
DetailsMike Jordan
ESC permit sign posted.
Site Preparation1/21/20091/21/20091/21/2009APART
DetailsMike Jordan
BMP's in place. Gave RP verbal c/n to post ESC signs.