Permit Information
Permit NumberESC08-00901
StatusFinaled
Name JAMES LARKIN
Site Address 8891 W EVENING STAR LN
Project NamePinetree Village
Customer Number 
ePlanReview 
Description
Unit 1 Buiding 15
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/21/200910/21/200910/21/2009PPASS
DetailsClint A Smith
BMP Violation3/9/20093/9/20093/9/2009APASS
DetailsMike Jordan
All const. debries have been cleaned up.
General Inspection3/5/20093/5/20093/5/2009PPART
DetailsMike Jordan
Needs to pick up const. debries around job site. Verbal c/n given to RP. Needs to be done prior to energy insp.
Random Inspection2/26/20092/26/20092/26/2009PPART
DetailsJim Johnson
had talk with RP on trash container,s for site
BMP Violation2/20/20092/20/20092/20/2009PPART
DetailsMike Jordan
Significant progress has been made on cleanup. Needs to pick up const. debries.
BMP Violation2/19/20092/19/20092/19/2009AFAIL
DetailsMike Jordan
Needs to sweep all sediments from street, sidewalk and gutterpans. VErbal c/n given to RP.
Tracking Control2/18/20092/18/20092/18/2009PPART
DetailsMike Jordan
Trackout is minimal, contractor is sweeping on a daily basis and as needed.
Random Inspection2/10/20092/10/20092/18/2009PPASS
DetailsMichael Garner
this assigned inspection was placed on my schedule accidentally according to my supervisor - I am canceling this inspection
Tracking Control2/17/20092/17/20092/17/2009PPASS
DetailsMike Jordan
Random Inspection2/11/20092/11/20092/11/2009PPASS
DetailsMike Jordan
Random Inspection2/10/20092/10/20092/10/2009PPASS
DetailsMike Jordan
BMP Violation1/27/20091/29/20091/29/2009APART
DetailsClint A Smith
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
BMP Violation1/27/20091/27/20091/27/2009PFAIL
DetailsClint A Smith
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
Site Preparation1/22/20091/22/20091/22/2009PPASS
DetailsMike Jordan
ESC permit sign posted.
Site Preparation1/21/20091/21/20091/21/2009APART
DetailsMike Jordan
All BMP's in place. Gave RP verbal c/n to post ESC permit signs.