Site Final | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Steven Webb
|
|
|
|
Site Preparation | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PART |
Steven Webb
|
|
|
Re-seeding in progress.
|
Random Inspection | 11/17/2008 | 11/17/2008 | 11/17/2008 | P | NR |
Steven Webb
|
|
|
No signs that work has commenced. Talked to RP (Eldon-Idaho Power). Re-vegetation is scheduled to start tomorrow. Will inspect tomorrow.
|
Site Preparation ESC | 10/24/2008 | 10/24/2008 | 10/24/2008 | | CANC |
Clint A Smith
|
|
|
Duplicate
|
Random Inspection | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Steven Webb
|
|
|
Fire breaks have been graded and mag. choride being applied on the bare ground.
|
Site Preparation | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | PASS |
Steven Webb
|
|
|
Informed Idaho Power that biggest issue will be potential for trackout. Sign is posted.
|
Site Preparation | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | CANC |
Clint A Smith
|
|
|
Passed per #420 (Steve Webb)
|