Permit Information
Permit NumberESC08-00939
StatusFinaled
Name SHANE JAYO
Site Address 591 E ORION CT
Project Name 
Customer Number 
ePlanReview 
Description
Inspector refer to approved SWPPP/ESC Plan.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/12/20098/13/20098/13/2009APASS
DetailsTony Young
DOC - Permit Finaled8/13/20098/13/20098/13/2009PPASS
DetailsTony Young
General Inspection8/4/20098/4/20098/4/2009APASS
DetailsDoug A Poedy
Site looks good.
General Inspection4/16/20094/16/20094/16/2009APASS
DetailsDixie Fellows
garbage just emptied again..site clean..wattles in place after rain
Tracking Control4/13/20094/14/20094/14/2009APASS
DetailsDixie Fellows
container emptied and site clean
Random Inspection4/10/20094/13/20094/13/2009AFAIL
DetailsDixie Fellows
garbage over flowing out of container and laying around job site..callled rp and they will be out tues am to empty and clean up site
Random Inspection4/9/20094/10/20094/10/2009ACANC
DetailsDixie Fellows
rescheduled for mon am
Random Inspection4/6/20094/6/20094/6/2009APASS
DetailsDaryl Spivey
General Inspection4/6/20094/6/20094/6/2009PPASS
DetailsPat Lass
Complaint Inspection3/20/20093/24/20093/24/2009APASS
DetailsDaryl Spivey
sign to be posted....ds
sign reposted...ds
Random Inspection3/19/20093/19/20093/20/2009PFAIL
DetailsDaryl Spivey
no sign posted...told Shane (rp).will get one and post by Tues...3/24...........ds
Random Inspection1/22/20091/22/20091/22/2009PPASS
DetailsDaryl Spivey
corrections cited by inspector 316 have been corrected.......ds
General Inspection1/15/20091/15/20091/15/2009PFAIL
DetailsJim Sly
Talked to Shane (RP) bhc-icae Need to repair silt fence at North and South sides...Unclog upper end of pipe in gutter at entry....clean "Track out" ...add straw waddles at areas needed around site entry and porta potty. advise concrete truck drivers to not clean equipment where it will run down to street. Will check at Foundation wall insp.
Random Inspection12/30/200812/30/200812/30/2008APASS
DetailsClint A Smith
Random Inspection12/11/200812/16/200812/16/2008APART
DetailsClint A Smith
General Inspection12/9/200812/15/200812/15/2008APASS
DetailsClint A Smith
Site Preparation12/11/200812/11/200812/11/2008PPART
DetailsTony Young
need inlet protection below job
460 will verify next week
BMP Violation12/8/200812/9/200812/9/2008APART
DetailsClint A Smith
Spoke with RP and told him to back fill on the silt fence on the south end of lot. Will re-inspect on 12/15/08.
BMP Violation11/26/200812/2/200812/2/2008AFAIL
DetailsClint A Smith
(left a message with the RP Shane Jayo)
Correction Notice:
1. Install a covert pipe where the land bridge is at the access.
2. Install silt fence per manufactors specs.
3. Provide a proper concrete washout pit with signage.
4. Post ESC sign at front of lot.
Failure to comply will result in a stop work order. Will re-inspect on 12/5/08 AM
Site Preparation11/26/200811/26/200811/26/2008 FAIL
DetailsClint A Smith
Verbal Correction: (left a message to the RP)
1. Install a pipe at the land berm at the access of lot.
3. Install silt fence per manufacture specs.
4. Post the ESC sign at the front of lot.
Will re-inspect on 12/2/08 AM.
General Inspection11/21/200811/21/200811/21/2008PPASS
DetailsPat Lass
site looks ok
Site Preparation11/21/200811/21/200811/21/2008APART
DetailsClint A Smith
Left a message with the RP to post there ESC sign.