Site Final | 7/7/2009 | 7/7/2009 | 7/7/2009 | P | PASS |
Jim Sly
|
|
|
Ray phone ###-####
|
Site Final | 7/7/2009 | 7/7/2009 | 7/7/2009 | P | PASS |
Jim Sly
|
|
|
Ray phone
|
Site Final | 4/3/2009 | 7/3/2009 | 7/7/2009 | A | CANC |
Jim Sly
|
|
|
Ray phone ###-####
|
DOC - Permit Finaled | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 4/2/2009 | 4/3/2009 | 4/3/2009 | A | FAIL |
Jim Sly
|
|
|
70% of site to be landscaped.....remainder of denuded soils to be stabilized. Complete 90 days from this date. Insp scheduled for 7/3/09.
|
Site Final | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | CANC |
Jim Sly
|
|
|
Re-sched....
|
General Inspection | 4/2/2009 | 4/2/2009 | 4/2/2009 | A | PASS |
Jack Frank
|
|
|
|
Tracking Control | 3/9/2009 | 3/11/2009 | 3/11/2009 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | FAIL |
Jim Sly
|
|
|
See previous corrections.
|
General Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | A | FAIL |
Jack Frank
|
|
|
notice posted tracking and clean all hard surfaces
|
General Inspection | 3/9/2009 | 3/9/2009 | 3/9/2009 | A | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to clean up tracking & dirt & debris off all hard surfaces.
|
Tracking Control | 2/27/2009 | 3/2/2009 | 3/3/2009 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 2/27/2009 | 2/27/2009 | 2/27/2009 | A | FAIL |
Eric Strole
|
|
|
Left verbal correction with rp to clean dirt & debris off all hard surfaces by 3-2-09 am.
|
General Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 | P | PASS |
Jim Sly
|
|
|
Andrew phone ###-####
|
Site Preparation | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Jim Sly
|
|
|
|