DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection ESC6/10/20106/10/20106/10/2010 DONE
DetailsClint A Smith
DOC - Permit Finaled6/10/20106/10/20106/10/2010PPASS
DetailsClint A Smith
General Inspection ESC5/10/20105/10/20105/10/2010 CANC
DetailsClint A Smith
General Inspection11/12/200911/16/200911/16/2009APASS
DetailsClint A Smith
General Inspection11/10/200911/10/200911/12/2009AFAIL
DetailsClint A Smith
Verbal message to GC:
Must supply a valid RP that has day to day controls over EC issues. Will re-inspect on 11/16/09AM.
Conference11/3/200911/3/200911/3/2009ADONE
DetailsClint A Smith
Spoke with RP:
RP is leaving Lure Construction. TOld him they must provide a new RP by 11/6/09am. Also was told that it might switch over to the contractor that is buildingthe retirement facility within the developement. Will re-inspect on 11/9/09 for changes.
Site Final11/2/200911/3/200911/3/2009ACANC
DetailsClint A Smith
Moved to a confrence.
BMP Violation10/13/200910/13/200910/13/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Correction Notice
1. Clean up all hard surfaces of all sediment and debris.
2. Maintain all storm drain inlets affected by the site developement.
3. Clean up all trash debris in developent area by removing or placing into a container.
Failure to comply will result in a stop work order. Will re-inspect on 10/14/09am.
Tracking Control10/5/200910/6/200910/6/2009APART
DetailsClint A Smith
Verbal to RP:
Re sweep the street one other time for completion of clean up.
Tracking Control10/5/200910/5/200910/5/2009AFAIL
DetailsClint A Smith
Correction Notice:
Clean up all hard surfaces of all sediment and debris. Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 10/06/09 AM.
BMP Violation9/1/20099/2/20099/2/2009APASS
DetailsEric Strole
construction entrance is installed.
BMP Violation8/31/20099/1/20099/1/2009AFAIL
DetailsEric Strole
Left written & verbal correction with rp to install an approved construction entrance on west side of project coming into parking lot by 9-2-09 am or a stop work will be issued. This entrance will be used in place of main entrance while roads for project are being paved.
BMP Violation8/31/20098/31/20098/31/2009PPART
DetailsEric Strole
west side entrance will be complete by days end. will reinspect 9-01-09.
BMP Violation8/27/20098/31/20098/31/2009AFAIL
DetailsEric Strole
left verbal correction with rp to complete previous correction by days end. rp will fence off area.
General Inspection8/27/20098/27/20098/27/2009APART
DetailsSteven Webb
Verbal to RP, install proper rock construction entrance and protect internal drop inlet on west side of project or barricade the access point. Complete by the end of the day on 8/28/09, re-inspection will occur on Monday, 8/31/09
Complaint Inspection8/27/20098/27/20098/27/2009PPASS
DetailsEric Strole
no issue with complaint.
BMP Violation8/26/20098/27/20098/27/2009APASS
DetailsEric Strole
BMP Violation8/26/20098/26/20098/26/2009PFAIL
DetailsEric Strole
left verbal correction with rp to protect di box on north west side of parking lot. all other di's are protected.
BMP Violation8/24/20098/26/20098/26/2009ACANC
DetailsEric Strole
Check that all storm drains have protection within the project on all completed curb and gutter.
BMP Violation8/20/20098/24/20098/24/2009APART
DetailsClint A Smith
Need to protect more of the completed storm drains within the project area. Will be re-inspected on 8/26/09 AM.
Site Preparation8/19/20098/19/20098/20/2009AFAIL
DetailsClint A Smith
Message to RP & verbal to Super (Matt):
protect all interior storm drain inlets that are active. Also to clean up gutterpans. Will re-inspect on 08/24/09 AM.
BMP Violation8/6/20098/7/20098/7/2009APASS
DetailsClint A Smith
Complaint Inspection8/5/20098/6/20098/6/2009AFAIL
DetailsClint A Smith
Message to RP:
1. Explained to RP that a Construction Exit constructed with crushed basalt rock 4-8 inches depth with a geotextile fabric underneath the rock. This will meet the Erosion Control requirement and also the Fire code requirements. Must occur by the end of the day 8/6/09. Will reinspect on 8/7/09 AM
Tracking Control8/5/20098/5/20098/5/2009PFAIL
DetailsClint A Smith
Correction Notice: (Message to RP)
1. Install a stabilized Construction Exit or block off access at the south west end of project area.
2. Clean up all sediment and debris off of all hard surfaces at the south west end of project area.
3. Protect storm drain inlets with the residental neighborhood from the south west end of project area.
Failure to comply with correction notice within the given time frame will result in a Stop Work Order.

Will re-inspect on 8/6/09 AM.
Complaint Inspection8/5/20098/5/20098/5/2009PFAIL
DetailsClint A Smith
Correction Notice: (Message to RP)
1. Install a stabilized Construction Exit or block off access at the south west end of project area.
2. Clean up all sediment and debris off of all hard surfaces at the south west end of project area.
3. Protect storm drain inlets with the residental neighborhood from the south west end of project area.
Failure to comply with correction notice within the given time frame will result in a Stop Work Order.

Will re-inspect on 8/6/09 AM.
Tracking Control7/27/20097/29/20097/29/2009APASS
DetailsClint A Smith
Tracking Control7/27/20097/27/20097/27/2009PFAIL
DetailsClint A Smith
Message to RP:
CLean up tracking off of site at the South West end of project area. Will re-inspect on 7/29/09am
BMP Violation6/16/20096/18/20096/18/2009APASS
DetailsClint A Smith
BMP Violation6/12/20096/16/20096/16/2009AFAIL
DetailsClint A Smith
Correction Notice: (Message to RP)
1. Clean up concrete spoil pile at the south end of project area.
2. Block off access point or stabilize it with an approved stabilized construction exit.
** Failure to comply will result in a Stop Work Order**
Will re-inspect on 6/18/09 AM
General Inspection6/12/20096/12/20096/12/2009PFAIL
DetailsClint A Smith
Verbal to RP:
clean up concrete spoils at the back of project area.
Block off or provide a stabilized access at the back of project.
Will re-inspct on 6/16/09 am.
Tracking Control6/1/20096/1/20096/1/2009PPART
DetailsClint A Smith
Re costructed exit per industry standards. Spoke with RP that if they are going to allow the other developers to washout in there washout area that he must provide a pit where signage is of concrete washout.
Complaint Inspection5/26/20095/26/20095/26/2009PFAIL
DetailsClint A Smith
Discussed with RP over the dust issues that are being generated with the earth work on the project area. Told RP that he needs to be more agressive with the use of there water truck. Left a message with the complaintee of what I discussed with the issue.
BMP Violation5/20/20095/26/20095/26/2009APART
DetailsClint A Smith
Entrance will be re-constructed once the screening machine is complete. Will be re-established by next week. Also D.I. will be cleaned out by the end of the day.
Random Inspection5/20/20095/20/20095/20/2009AFAIL
DetailsClint A Smith
Message to RP:
Maintain construction entrance.
Maintain D.I. along Overland Rd.
Provide a proper Concrete Washout Pit.
Will re-inspect on 5/26/09AM.
Site Preparation5/5/20095/6/20095/6/2009PPASS
DetailsClint A Smith
Tracking Control5/5/20095/5/20095/5/2009PFAIL
DetailsClint A Smith
Tracking onto overland rd. Left a message with RP to have it cleaned up by 5/6/09 AM. Will re-inspect on 5/6/09 PM
Conference4/8/20094/9/20094/9/2009PDONE
DetailsSteven Webb
Reviewed project with RP and other sub-contractors. Provided an overview of major potential issues, including dust, concrete washout, trackout, perimeter controls and drop inlet protection.
Site Preparation4/7/20094/7/20094/8/2009PCANC
DetailsClint A Smith
Random Inspection3/27/20093/27/20093/27/2009APASS
DetailsClint A Smith
Random Inspection3/18/20093/18/20093/18/2009PPASS
DetailsClint A Smith
BMP Violation3/11/20093/12/20093/12/2009ADONE
DetailsClint A Smith
duplicate
General Inspection3/12/20093/12/20093/12/2009ADONE
DetailsClint A Smith
Found no residual of a petroleum with in the project area.

Notified ACHD over the residual of the petroleum remaining in the road way and also next the storm drain to the East, on the Overland / Cortell intersection. I was told that they will notify the contractor to do further clean up. Will be re-inspected by Tom Dillian with ACHD for compliance of the clean up. I will have no further actions pertaining with the spill since it is in the the ACHD right-away.

CAS
#460
BMP Violation3/11/20093/11/20093/11/2009PFAIL
DetailsClint A Smith
Verbal Correction notice to Lure Excavation:
Need to clean up all petroleum fluid out onto Overland heading East towards Maple Grove. Also notified Tom Dillian with ACHD over the issue. He will be contacting Ed with Lure Construction. Will re-inspect on 3/12/09
AM.
Tracking Control2/26/20092/27/20092/27/2009APART
DetailsClint A Smith
all tracking is cleaned up. Told GC that they need to install there sediment barriers in certain locations on the project perimeter. Mostly along the west side of project at the stock piles.
BMP Violation2/24/20092/26/20092/26/2009PFAIL
DetailsClint A Smith
Left a message with GC supe of project:
Clean up tracking onto Overland Rd. Will re-inspect on 2/27/09 AM.
Conference2/25/20092/25/20092/25/2009PDONE
DetailsClint A Smith
Went over with the GC and the Erosion Control Company of the amendments to the swpps regardthere perimeter controls and placement of the product that they will be using.
BMP Violation2/24/20092/24/20092/24/2009PCANC
DetailsClint A Smith
Random Inspection2/24/20092/24/20092/24/2009PFAIL
DetailsClint A Smith
Told GC to re-install silt fence per industry standards. Also to stablize or block off the access point to the west of the stabilized access. Will re-inspect on 2/26/09 PM.
Site Preparation2/20/20092/20/20092/20/2009PPASS
DetailsClint A Smith
Site Preparation11/17/200811/17/200811/17/2008 NR
DetailsClint A Smith