Site Final | 10/29/2009 | 10/29/2009 | 10/29/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 10/14/2009 | 10/14/2009 | 10/14/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 10/13/2009 | 10/13/2009 | 10/13/2009 | A | PASS |
Jack Frank
|
|
|
site ok
|
BMP Violation | 6/26/2009 | 6/29/2009 | 6/29/2009 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 6/26/2009 | 6/26/2009 | 6/26/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Protect the slope that receeds toward the canal by using and sediment barrier. Once piles are removed the area must be stabailized with an approved application. Will re-inspect on 6/26/09 PM.
|
Site Preparation | 11/5/2008 | 11/5/2008 | 11/5/2008 | | PART |
Clint A Smith
|
|
|
Need to miniumize tracking and post sign at front of lot.
|