Site Final | 1/30/2009 | 1/30/2009 | 1/30/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 1/30/2009 | 1/30/2009 | 1/30/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Site Final | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | CANC |
Tom Arcoraci
|
|
|
|
General Inspection | 12/19/2008 | 12/19/2008 | 12/19/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/25/2008 | 11/25/2008 | 11/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 11/20/2008 | 11/20/2008 | 11/20/2008 | | PART |
Clint A Smith
|
|
|
Due to the potental storm event. I discussed with the RP to cover the pile. He said it will be done prior to the rain.
|
General Inspection | 11/13/2008 | 11/13/2008 | 11/13/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|