Site Final | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Jim Sly
|
|
|
Mike Phone
|
Site Final | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Jim Sly
|
|
|
Mike Phone
|
Site Final | 1/8/2009 | 1/8/2009 | 1/8/2009 | P | FAIL |
Jim Sly
|
|
|
Talked to RP...bdf-ihci Need to sweep asphalt.....
|
BMP Violation | 12/30/2008 | 12/31/2008 | 12/31/2008 | P | PART |
Clint A Smith
|
|
|
Scheduled with Ground FX to install all protection today will re-inspect tomorrow.
|
BMP Violation | 12/29/2008 | 12/30/2008 | 12/30/2008 | P | FAIL |
Clint A Smith
|
|
|
Since RP is out of town. I explained the violations to the contractor and told him I will be back tomorrow afternoon. If issues are not corrected a stop work order will be issued.
|
General Inspection | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | FAIL |
Clint A Smith
|
|
|
Left a message with RP. Correction Notice: 1. Protect all Storm drain inlets that will be or are effected by the project. 2. Contain trash pile from demo worrk with sometype of sediment barrier to trap any particals from the snow melt run off. Will re-inspect on 12/30/08.
|