Site Final | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PASS |
Dixie Fellows
|
|
|
|
General Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
Tracking Control | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 2/19/2009 | 2/19/2009 | 2/19/2009 | P | PASS |
Jack Frank
|
|
|
site ok
|
Random Inspection | 2/4/2009 | 2/5/2009 | 2/5/2009 | A | PART |
Eric Strole
|
|
|
met with rp on site, he is on site to make sure all concrete washout in done in an approved manner. looks good, there will be no washout outside of building.
|
Random Inspection | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PART |
Eric Strole
|
|
|
Unable to get a hold of rp to find out about concrete washout or how they are going to dispose of excess concrete & cleanout. They will be pouring concrete on 2-5-09 will reinspect on 2-05-09
|
General Inspection | 1/26/2009 | 1/26/2009 | 1/26/2009 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 1/15/2009 | 1/20/2009 | 1/20/2009 | P | PASS |
Clint A Smith
|
|
|
No issues present. Have not discussed with rp yet where they will be washing out yet.
|
Site Preparation | 1/15/2009 | 1/15/2009 | 1/15/2009 | | PART |
Clint A Smith
|
|
|
Left message with RP: Concrete washout not provided at this time. Must provide a washout pit (external or pit) prior to concrete pour. Will re-inspect on 1/20/09.
|