Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC08-01043
StatusFinaled
Name SHAWN METIER
Site Address 3630 N EAGLE RD
Project Name 
Customer Number 
ePlanReview 
Description
Home Federal
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/31/20098/31/20098/31/2009APASS
DetailsSteven Webb
Shawn ###-####: Light mulch, tack and Steve Regan Dryland Pasure Mix verified.
DOC - Permit Finaled8/31/20098/31/20098/31/2009PPASS
DetailsSteven Webb
Hydroseeded applied, including light paper mulch, tack and Steve Regan Dryland Pasure Seed Mix.
Site Final8/28/20098/28/20098/28/2009PNR
DetailsJim Sly
Talked to RP....Need adjacent disturbed areas stabilized and all BMPs removed.
Random Inspection8/3/20098/3/20098/3/2009PFAIL
DetailsDoug A Poedy
DI'S Still needed cleaned.
Conference8/3/20098/3/20098/3/2009PPART
DetailsClint A Smith
Verbal to RP:
clean out d.i.'s prior to the next storm events.
General Inspection7/29/20097/30/20097/30/2009AFAIL
DetailsDoug A Poedy
8-17-02.4E,J DI needs cleaned out. 8-17-02.4 P Concrete wash out liner needs installed. Hard surfaces need to be cleaned.
Conference7/29/20097/30/20097/30/2009ADONE
DetailsClint A Smith
8:30am
Meeting with Doug the electrical inspector for training and enforcement if needed.

Refer to previous inspection of enforcement.
Random Inspection7/30/20097/30/20097/30/2009APART
DetailsJim Storey
General Inspection7/29/20097/29/20097/29/2009PDONE
DetailsDoug A Poedy
Called Clint and I am meeting him on job site 8:30 am 7-30-09
Random Inspection7/24/20097/24/20097/24/2009PPASS
DetailsMike Jordan
General Inspection7/23/20097/23/20097/23/2009PPASS
DetailsJack Frank
ok
Tracking Control7/1/20097/1/20097/1/2009PPASS
DetailsClint A Smith
They have deliniated the project boundry.
Tracking Control6/24/20096/26/20096/26/2009APART
DetailsClint A Smith
Gave the RP until 6/29/08 AM. Has used caution tape as a temporary measure.
General Inspection6/24/20096/24/20096/24/2009PPART
DetailsClint A Smith
Verbal to RP:
Provide additional access controls along the North end of proprety area not just to restrict access, also to deliniate project boundries. Will re-inspect on 6/25/09 PM.
Site Preparation6/23/20096/23/20096/23/2009PPASS
DetailsJim Sly
Site Preparation6/19/20096/19/20096/19/2009 PASS
DetailsClint A Smith
Site Preparation6/17/20096/18/20096/18/2009APASS
DetailsJim Sly
BMPs in place.....appears OK
Site Preparation6/17/20096/17/20096/17/2009ACANC
DetailsJim Sly
Site Preparation6/12/20096/15/20096/15/2009APART
DetailsClint A Smith
In the process of implimenting the BMP's per there erosion control plan.