Tracking Control | 10/1/2009 | 10/2/2009 | 10/2/2009 | P | PASS |
Dixie Fellows
|
|
|
check job at 1:00
|
Site Final | 10/2/2009 | 10/2/2009 | 10/2/2009 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 10/2/2009 | 10/2/2009 | 10/2/2009 | P | PASS |
Tony Young
|
|
|
done
|
Site Final | 10/2/2009 | 10/2/2009 | 10/2/2009 | P | PART |
Tony Young
|
|
|
doing final clean
|
General Inspection | 9/30/2009 | 10/1/2009 | 10/1/2009 | P | FAIL |
Dixie Fellows
|
|
|
aaron is the contact...mp will have all garbage, etc cleaned up by fri at 1:00
|
General Inspection | 8/18/2009 | 8/18/2009 | 8/18/2009 | A | FAIL |
Mike Jordan
|
|
|
Needs to pick up all const. debries from yard. verbal c/n to RP.
|
Random Inspection | 1/6/2009 | 1/6/2009 | 1/6/2009 | P | PASS |
Pat Lass
|
|
|
looks ok
|
Site Preparation | 1/6/2009 | 1/6/2009 | 1/6/2009 | | PASS |
Clint A Smith
|
|
|
|