Site Final | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Jim Sly
|
|
|
Gary phone
|
DOC - Permit Finaled | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 5/11/2009 | 5/11/2009 | 5/11/2009 | P | PASS |
Jim Sly
|
|
|
|
BMP Violation | 4/29/2009 | 5/1/2009 | 5/1/2009 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 4/29/2009 | 4/29/2009 | 4/29/2009 | A | FAIL |
Eric Strole
|
|
|
left verbal correction on voice mail of rp to protect di box & clean up trash & clean gutter pan by 5-01-09 am.
|
General Inspection | 4/23/2009 | 4/23/2009 | 4/23/2009 | A | PART |
Jack Frank
|
|
|
ok need to complete cleanup of trash
|
BMP Violation | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PASS |
Mike Jordan
|
|
|
All issues have been resolved.
|
General Inspection | 1/29/2009 | 1/29/2009 | 1/29/2009 | A | FAIL |
Clint A Smith
|
|
|
see prior inspection.
|
Site Preparation | 1/29/2009 | 1/29/2009 | 1/29/2009 | A | FAIL |
Mike Jordan
|
|
|
Needs to provide drain inlet protection in front of house. Contain excavated soils or remove them immediatly. Also needs to sweep and scrape sediment from sidewalk and gutter pan. Will reinspect on 1/30/09. A c/n was isued. Non compliance will result in stop work order.
|