Site Final | 3/19/2010 | 3/22/2010 | 3/22/2010 | A | PASS |
Dave Hannah
|
|
|
RTF
|
DOC - Permit Finaled | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 3/26/2009 | 3/26/2009 | 3/26/2009 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 1/30/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/30/2009 | 1/30/2009 | 1/30/2009 | | NR |
Clint A Smith
|
|
|
Left message with RP over the start date.
|