Site Final | 4/17/2009 | 4/22/2009 | 4/21/2009 | P | PASS |
Steven Webb
|
|
|
Verfiy removal of BMPs. BMPs removed, bare ground has been strayed with tackifier and seed.
|
Site Final | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | CANC |
Steven Webb
|
|
|
Steve....All BMPs appear to be removed....Not sure if denuded soils have been stabilized....thats why i'm sending inspection to you. Jim Sly Contact Jack at ###-####: DUPLICATE INSPECTION
|
Site Final | 4/21/2009 | 4/21/2009 | 4/21/2009 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 4/16/2009 | 4/17/2009 | 4/17/2009 | P | PART |
Steven Webb
|
|
|
Need bmp's removed then permit can be finaled. Informed RP.
|
Site Final | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | PART |
Steven Webb
|
|
|
Hydroseeding in progress, will re-inspect tomorrow.
|
Site Final | 3/25/2009 | 3/26/2009 | 3/26/2009 | A | FAIL |
Steven Webb
|
|
|
Call Jack prior to inspection ###-####: Bare ground has not achieved stabilization. Reviewed options for Jack and requested he ask for re-inspection when ready.
|
Site Preparation | 1/30/2009 | 1/30/2009 | 1/30/2009 | | PASS |
Clint A Smith
|
|
|
BMP's in place, but no demo has occured yet. Sign also posted.
|