Site Final | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 2/20/2009 | 2/23/2009 | 2/23/2009 | P | FAIL |
Clint A Smith
|
|
|
Could not pass final due to minor disturbed area that still need 3/4 chip spread out. Once it is complete, it will pass the final inspection. Will be contacted once it is complete.
|
General Inspection | 2/1/2009 | 2/2/2009 | 2/2/2009 | A | PASS |
Eric Strole
|
|
|
Trainning (stream crossing)
|
General Inspection | 1/30/2009 | 2/2/2009 | 2/2/2009 | A | PASS |
Clint A Smith
|
|
|
Went over the scope of work with the contractor. Also did a infield training with Eric Strole over stream bank crossing pertaining with erosion and sediment control.
|
Site Preparation | 2/2/2009 | 2/2/2009 | 2/2/2009 | | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Clint A Smith
|
|
|
Will be meeting up with RP on 2/2/09 to go over project details. All required bmp's and signage are inplace. Will re-inspect on 2/2/09
|