Permit Information
Permit NumberESC09-00021
StatusFinaled
Name BRANDON MCCURDY
Site Address 320 N ALLUMBAUGH
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/7/20107/9/20107/8/2010ADONE
DetailsTom Arcoraci
General Inspection6/23/20107/8/20107/8/2010APASS
DetailsTom Arcoraci
DOC - Permit Finaled7/1/20107/1/20107/1/2010PPASS
DetailsClint A Smith
General Inspection5/26/20106/23/20106/23/2010APART
DetailsTom Arcoraci
has been revegated will check in 2 weeks
General Inspection5/26/20106/4/20106/7/2010APART
DetailsTom Arcoraci
check for reveg on lot incomplete at this time
General Inspection5/26/20105/26/20105/26/2010PPART
DetailsTom Arcoraci
work in progress on lot reveg
General Inspection4/28/20104/28/20104/28/2010PFAIL
DetailsTom Arcoraci
lot next to projet not yet stabized and re vegateted
BMP Violation3/8/20103/10/20103/10/2010APART
DetailsClint A Smith
Activily removing all material off of the hard surface and will be placing protection back into the inlet.
BMP Violation3/5/20103/8/20103/8/2010AFAIL
DetailsClint A Smith
Correction Notice:
Per the pervious inspection No issues were taken care of Please refer to pervious inspection for violations. Will Re-inspect on 3/10/10AM.
BMP Violation3/5/20103/5/20103/5/2010PFAIL
DetailsClint A Smith
Message to RP:
Protect storm drain inlet to the east of parking lot. Remove or protect stock piles with a sediment barrier along the down hill spole of the parking lot. Will re-inspect on 3/8/10 am.
Random Inspection2/8/20102/8/20102/8/2010APASS
DetailsTom Arcoraci
General Inspection2/4/20102/4/20102/4/2010PPASS
DetailsBob Reichert
Random Inspection1/26/20101/26/20101/26/2010PPASS
DetailsTom Arcoraci
Random Inspection1/20/20101/20/20101/20/2010PPASS
DetailsTom Arcoraci
Random Inspection1/13/20101/13/20101/13/2010PPASS
DetailsTom Arcoraci
Random Inspection1/5/20101/5/20101/5/2010APASS
DetailsTom Arcoraci
Random Inspection12/24/200912/24/200912/24/2009PPART
DetailsClint A Smith
Repost ESC sign at the front of project.
General Inspection12/15/200912/15/200912/15/2009PPASS
DetailsBob Reichert
looked ok
General Inspection12/10/200912/14/200912/14/2009ADONE
DetailsClint A Smith
No grading is occuring due to snow.
General Inspection11/30/200911/30/200911/30/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection11/19/200911/19/200911/19/2009PPASS
DetailsTom Arcoraci
BMP Violation11/13/200911/13/200911/13/2009APART
DetailsClint A Smith
Verbal to RP:
Once plates are removed from the storm drain inlets, place in approved storm drain inlet protection.
Random Inspection11/12/200911/12/200911/12/2009PPASS
DetailsTom Arcoraci
Random Inspection11/10/200911/11/200911/12/2009PPASS
DetailsTom Arcoraci
Random Inspection11/4/200911/4/200911/4/2009PPASS
DetailsTom Arcoraci
General Inspection10/29/200910/29/200910/29/2009PPASS
DetailsBob Reichert
looked ok
General Inspection10/27/200910/27/200910/27/2009AFAIL
DetailsClint A Smith
Clean up all residual from the porter pottie. Anchor it down so no tipping occurs again.
Random Inspection10/21/200910/21/200910/21/2009APASS
DetailsTom Arcoraci
Tracking Control10/15/200910/19/200910/16/2009APASS
DetailsClint A Smith
Tracking Control10/15/200910/15/200910/15/2009AFAIL
DetailsClint A Smith
Verbal message to RP:
Clean all track out off of the project area.
Maintain construction entrance.

Spoke with the SUper of the job (Dale) and was told that at the end of the day of if it gets excessive he will have a sweepr come by. Also no one will be parking on the project as of tomorrow. Will re-inspect on 10/19/09 AM.
BMP Violation10/13/200910/14/200910/14/2009PPASS
DetailsClint A Smith
BMP Violation10/8/200910/13/200910/13/2009AFAIL
DetailsClint A Smith
Message to RP:
Correction Notice:
Restabilize construction exit with a top coat of 2" washed rock. Failure to comply will result in a stop work order will re-inspect on 10/14/09PM.
Tracking Control10/8/200910/8/200910/8/2009AFAIL
DetailsClint A Smith
VErbal Correction to RP:
Re-stabilize construction exit from project by 10//9/09 or further enforcement will occur. Will re-inspect on 10/13/09 AM.
Random Inspection10/7/200910/7/200910/7/2009APART
DetailsTom Arcoraci
recheck
Tracking Control9/18/20099/22/20099/22/2009AFAIL
DetailsClint A Smith
Will be completed on 9/23/09.
Tracking Control9/18/20099/18/20099/18/2009AFAIL
DetailsClint A Smith
Provide a stabilized construction access. Will re-inspect on 9/22/09AM.
Random Inspection8/26/20098/26/20098/26/2009PPASS
DetailsMike Jordan
General Inspection8/24/20098/24/20098/24/2009PPASS
DetailsBob Reichert
looked ok
General Inspection8/18/20098/18/20098/18/2009APASS
DetailsJack Frank
ok
General Inspection8/13/20098/13/20098/13/2009APASS
DetailsDoug A Poedy
Random Inspection7/9/20097/9/20097/9/2009APART
DetailsTom Arcoraci
General Inspection7/8/20097/8/20097/8/2009PPART
DetailsClint A Smith
In the process of installing the proper construction exit. Site looks good.
General Inspection7/2/20097/2/20097/2/2009PPART
DetailsBob Reichert
did not see yellow sign, wating for sewer line to be installed, looked like in progress
Site Preparation6/26/20096/29/20096/29/2009APART
DetailsClint A Smith
Verbal to RP/GC:
Protect storm drains along Allumbaugh Rd on the East and West side of the road.
Will allow the there entrance as us until the sewer line is install next week.
Site Preparation6/26/20096/26/20096/26/2009PCANC
DetailsClint A Smith