General Inspection ESC | 6/1/2010 | 6/1/2010 | 6/1/2010 | | DONE |
Clint A Smith
|
|
|
Work is completed and area stabilized.
|
DOC - Permit Finaled | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/31/2009 | 8/3/2009 | 8/3/2009 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 7/31/2009 | 7/31/2009 | 7/31/2009 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice to RP: Clean up all sediment and debris off of all hardsurfaces from the discharge of the fire line flush at the south east corner of building. Clean up all sediment within the storm water gutter pan and protect or remove stockpiles along the North end of the school. **Failure to comply will result in a stop work order.*** Will re-inspect on 8/3/09 AM
|
Site Preparation | 5/12/2009 | 5/12/2009 | 5/12/2009 | A | CANC |
Mike Jordan
|
|
|
|
Random Inspection | 5/12/2009 | 5/12/2009 | 5/12/2009 | A | PART |
Mike Jordan
|
|
|
Conc. washout will be in container until permanent one is provided. Needs to provide waddels around excavated materials.
|
Site Preparation | 4/20/2009 | 4/20/2009 | 4/20/2009 | P | PASS |
Eric Strole
|
|
|
|
Site Preparation | 4/17/2009 | 4/20/2009 | 4/20/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 4/17/2009 | 4/17/2009 | 4/17/2009 | | CANC |
Eric Strole
|
|
|
changed till monday 4-20-09
|
Site Preparation | 4/17/2009 | 4/17/2009 | 4/17/2009 | | CANC |
Clint A Smith
|
|
|
Moved until 4/20/09 PM.
|