Site Final | 6/2/2009 | 6/2/2009 | 6/2/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 6/2/2009 | 6/2/2009 | 6/2/2009 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 4/6/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 4/6/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Jack Frank
|
|
|
site ok
|
General Inspection | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PART |
Eric Strole
|
|
|
Clean up occuring when needed. Site is not in bad shape.
|
BMP Violation | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all hard surface of all sediment and debris. Provide additional external protection on parking lot storm drain. Provide additional weigt to wattle on the hard surfaces. Will re-inspect on 4/2/09.
|
General Inspection | 3/31/2009 | 3/31/2009 | 3/31/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal to Excavator and RP: 1. Re-install all silt fence per industry standards. 2. Sweep up all hard surface of all sediment and debris. will re-inspect on 4/1/09AM.
|
Random Inspection | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Eric Strole
|
|
|
|
Site Preparation | 3/6/2009 | 3/12/2009 | 3/12/2009 | A | PART |
Eric Strole
|
|
|
met rp on site & went over di protection & bmp's required & tracking issues & to have a concrete washout pit before any concrete pour. concrete & asphalt from site will be removed on 3-13-09. sign posted & rp states he will clean project on a daily basis.
|
Site Preparation ESC | 3/6/2009 | 3/6/2009 | 3/6/2009 | | NR |
Clint A Smith
|
|
|
Will re-inspect in 1 week
|