General Inspection ESC | 6/14/2010 | 6/14/2010 | 6/14/2010 | | DONE |
Steven Webb
|
|
|
Permit finaled June 14, 2010
|
DOC - Permit Finaled | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Steven Webb
|
|
|
|
General Inspection ESC | 5/28/2010 | 5/28/2010 | 5/28/2010 | | DONE |
Clint A Smith
|
|
|
|
Site Final | 2/16/2010 | 3/15/2010 | 3/15/2010 | A | NR |
Clint A Smith
|
|
|
Has not achieved uniform coverage of vegitation over the entire area of disturbance. /Left a message with RP.
|
Site Final | 1/11/2010 | 2/15/2010 | 2/16/2010 | A | FAIL |
Clint A Smith
|
|
|
Once vegitation is established, will pass the final. Will re-inspect on 3/15/10
|
Site Final | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | FAIL |
Clint A Smith
|
|
|
Once vegitation is established, will pass the final. Will re-inspect on 3/15/10
|
Site Final | 5/26/2009 | 7/27/2009 | 7/27/2009 | A | NR |
Clint A Smith
|
|
|
|
Aging Inspection | 6/22/2009 | 6/22/2009 | 6/22/2009 | A | PART |
Jim Storey
|
|
|
no requist for insp.
|
General Inspection | 5/26/2009 | 5/26/2009 | 5/26/2009 | P | PASS |
Clint A Smith
|
|
|
Site has has a hydro seed blend applied to all of the site. Will re-inspect in 2 months for a site final if vegitation has been astablished.
|
General Inspection | 4/22/2009 | 4/22/2009 | 4/22/2009 | A | PASS |
Clint A Smith
|
|
|
Built up site along the east side of project area. Have a vegitative buffer and also a sediment barrier along the drainage canal.
|
General Inspection | 4/13/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Clint A Smith
|
|
|
Gutterpan
|
General Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up gutterpan to the south of entrance off of Yamhill of all sediment that leads to the storm drain. Also maintain storm drain protection. Will re-inspect on 4/14/09 PM.
|
General Inspection | 4/3/2009 | 4/6/2009 | 4/6/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 4/2/2009 | 4/3/2009 | 4/3/2009 | A | CANC |
Clint A Smith
|
|
|
Duplicate.
|
BMP Violation | 3/31/2009 | 4/3/2009 | 4/3/2009 | A | FAIL |
Clint A Smith
|
|
|
Left message with RP: 1. Correct the land bridge along the construction access off of Amity Rd. So no sediment can travel down the gutter pan. Will re-inspect on 4/6/09AM.
|
Site Preparation | 3/30/2009 | 3/30/2009 | 3/31/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Protect the remaining storm drains with inlet protection on the perimeter storm drains. 2. Re-install both construction entrances with the proper rock. Will re-inspect on 04/03/09AM.
|