Site Final | 4/17/2009 | 4/17/2009 | 4/17/2009 | A | PASS |
Dixie Fellows
|
|
|
|
General Inspection | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | PASS |
Pat Lass
|
|
|
looks ok
|
General Inspection | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Jim Sly
|
|
|
OK
|
Random Inspection | 3/5/2009 | 3/5/2009 | 3/5/2009 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign posted, BMP's in place. Site was clean fro const. debries.
|
Random Inspection | 3/4/2009 | 3/4/2009 | 3/5/2009 | P | PASS |
Tony Young
|
|
|
dumpster on site,, permit posted, daily clean up
|
General Inspection | 2/27/2009 | 2/27/2009 | 2/27/2009 | A | PASS |
Pat Lass
|
|
|
looks ok
|
Random Inspection | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PASS |
Dixie Fellows
|
|
|
site clean
|
Site Preparation | 2/24/2009 | 2/24/2009 | 2/24/2009 | | PASS |
Clint A Smith
|
|
|
|