Site Final | 10/20/2009 | 10/20/2009 | 10/20/2009 | A | PASS |
Jim Sly
|
|
|
Hal phone
|
Site Final | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 5/19/2009 | 5/19/2009 | 5/19/2009 | A | PASS |
Dixie Fellows
|
|
|
talked to rp about loose paper being contained..site kept clean
|
General Inspection | 5/15/2009 | 5/15/2009 | 5/15/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | A | PASS |
Dixie Fellows
|
|
|
just started project property is enclosed with a fence and looks good
|
General Inspection | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | PASS |
Pat Lass
|
|
|
looks ok
|
General Inspection | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Tony Young
|
|
|
wash out provided
|
Tracking Control | 3/17/2009 | 3/17/2009 | 3/17/2009 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 3/17/2009 | 3/17/2009 | 3/17/2009 | | PART |
Clint A Smith
|
|
|
All issues corrected from the prior inspections. RP will provide a washout prior to next pour date.
|
BMP Violation | 3/12/2009 | 3/16/2009 | 3/16/2009 | A | PART |
Eric Strole
|
|
|
stock pile is covered, need concrete washout pit before next pour.
|
Site Preparation | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | FAIL |
Tony Young
|
|
|
same
|
Site Preparation | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal correction message to RP: Due to confined space we will allow them to washout in the footing trench this time only. Prior to pour of garage they will need to provide a washout pit. Also need to protect stock pile at front of project by 3/13/09 PM. Will re-inspect on 3/16/09 AM.
|