Permit Information
Permit NumberESC09-00087
StatusFinaled
Name MIKE TSU
Site Address 8200 W FAIRVIEW AVE
Project NameWinCo Food Store #06
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/2/200912/2/200912/2/2009APASS
DetailsClint A Smith
Random Inspection10/19/200910/19/200910/19/2009PPASS
DetailsClint A Smith
Tracking Control10/1/200910/1/200910/1/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment and debris at the north end of project area behind the facility.
Will reinspect on 10/5/09am
General Inspection9/23/20099/30/20099/30/2009APASS
DetailsClint A Smith
General Inspection9/23/20099/23/20099/23/2009PPART
DetailsClint A Smith
Verbal to RP:
1. Protect storm drains within the staging area where extending it next week. Will re-inspect on 9/30/09 AM.
General Inspection8/3/20098/4/20098/4/2009AFAIL
DetailsDoug A Poedy
Called RP Notified of violation 8-17-02.4 P. Job site has trash and debris on east side. Appears to have dirt and powdered concrete in back alley. Has dirt piles that look older than 14 days.
General Inspection7/29/20097/29/20097/29/2009APART
DetailsDoug A Poedy
Site looks good. DI clean.
BMP Violation7/22/20097/23/20097/24/2009PPART
DetailsClint A Smith
Tracking Control7/22/20097/22/20097/22/2009PFAIL
DetailsClint A Smith
Correstion Notice to RP:
1. Clean up all sediment and debris off of all hard surfaces.
2. Cean up all conrete residual surrounding the concrete washout pit.
3. Clean all trash debris that is surrounding the trash container.

Failure to compy will result in further enforcement. Will re-inspect on 7/23/09 1.pm
Tracking Control7/9/20097/13/20097/13/2009APART
DetailsClint A Smith
Cleaning up at the end of the day daily.
General Inspection7/10/20097/10/20097/10/2009PPART
DetailsBob Reichert
460 will recheck back of building
General Inspection7/9/20097/9/20097/9/2009PPART
DetailsBob Reichert
460 will recheck back of building in a few days
General Inspection7/9/20097/9/20097/9/2009PFAIL
DetailsClint A Smith
Verbal to RP:
At the back of building needs to be cleaned up on a daily basis. Will reinspect on 7/13/09AM.
Site Preparation6/30/20096/30/20097/7/2009ACANC
DetailsJim Sly
Random Inspection6/23/20096/23/20096/23/2009PPART
DetailsJim Storey
appears to be complaint.
General Inspection6/9/20096/12/20096/11/2009PPART
DetailsClint A Smith
Cleaning up tracking out of parking lot and all hard surfaces. Washout has been cleaned out for pour this evening.
General Inspection6/11/20096/11/20096/11/2009PPASS
DetailsBob Reichert
looked ok, didn't notice trash or debris
Random Inspection6/9/20096/9/20096/9/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all hard surfaces of all sediment and debris.
Place all trash debris within the trash container.
Will re-inspect on 6/12/09 PM.
General Inspection6/5/20096/5/20096/5/2009PFAIL
DetailsJim Sly
Mike phone
Sweep all hard surfaces....clean out washout pit used for mortar....shovel, clean and sweep area around washout pit. Sweep cement and sand from around mortar mixing area. Install more plastic visqueen at mixing area for (more) containment......Raise perimeter of plastic visqueen to help contain cement mortar mix in approved area.
Site Preparation5/11/20095/11/20095/11/2009PPART
DetailsJim Sly
1st concrete pour.....advised Responsible person that a concrete washout pit is req. Backhoe on site....said he would dig one prior to placing any concrete.
Tracking Control4/28/20094/30/20094/30/2009APASS
DetailsClint A Smith
General Inspection4/24/20094/28/20094/28/2009AFAIL
DetailsClint A Smith
Told RP to clean up all tracking within the exsisting parking lot. and the back access of Winco Foods. Also post the ESC sign at the front gate of project area. Will re-inspect on 4/30/09AM.
Site Preparation ESC4/27/20094/27/20094/27/2009 CANC
DetailsClint A Smith
Moved until 4/28/09 on a General Inspection.
Site Preparation ESC4/27/20094/27/20094/27/2009 CANC
DetailsClint A Smith
Site Preparation4/23/20094/23/20094/24/2009PPART
DetailsClint A Smith
Verbal with RP:
Locaate the direction of construction traffic flow. Protect the storm drains within the area of the traffic flow. Will re-inspect on 4/28/09AM