Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC09-00093
StatusFinaled
Name GARRET J SMITH
Site Address 2913 S EAGLESON RD
Project NameBoise Airport Shuttle Parking
Customer Number 
ePlanReview 
Description
grading/drainage and site utilities
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection ESC9/8/20109/8/20109/8/2010 DONE
DetailsClint A Smith
DOC - Permit Finaled9/8/20109/8/20109/8/2010PPASS
DetailsClint A Smith
General Inspection ESC9/7/20109/7/20109/8/2010 CANC
DetailsSteven Webb
duplicate
General Inspection ESC8/5/20108/5/20108/5/2010 DONE
DetailsClint A Smith
Stock pile still remains.
General Inspection ESC7/5/20107/5/20107/6/2010 PASS
DetailsClint A Smith
General Inspection ESC6/4/20106/4/20106/4/2010 PART
DetailsClint A Smith
Stockpile still being actively worked.
Random Inspection5/4/20105/4/20105/4/2010PPART
DetailsTom Arcoraci
General Inspection11/20/200911/20/200911/20/2009AFAIL
DetailsTom Arcoraci
needs soil stab
General Inspection11/12/200911/12/200911/12/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Post ESC sign where visable from the street.
Must stabilize all bare soil prior to finaling permit.
Random Inspection9/14/20099/14/20099/14/2009APASS
DetailsTom Arcoraci
Tracking Control7/23/20097/24/20097/24/2009APASS
DetailsClint A Smith

Tracking Control7/23/20097/23/20097/23/2009AFAIL
DetailsClint A Smith
Message to RP:
Clean up all tracking onto Victory Rd. from Eagleson Rd that is not a stabilized construction exit. Also block off access point better or install a stabilized construction exit per city standards. Will re-inspect on 7/24/09AM.
Tracking Control5/28/20095/29/20095/29/2009PPART
DetailsClint A Smith
No wings or access control have been installed yet on the exit area of project. Will monitor the traffic off of the project if those variables need to be implimented.
BMP Violation5/27/20095/28/20095/28/2009PPART
DetailsClint A Smith
Verbal to RP per Steve Webb:
Install a proper construction exit per the ESC plan with the min. of 12ft width, 50ft length with angling outward on both sides. Must install access control to delineate point of access on and off site. Will re-inspect on 5/29/09 PM.
Site Preparation5/28/20095/28/20095/28/2009 FAIL
DetailsClint A Smith
Site prep occured on 5/27/09. A pending correction notice is in place. Will re-inspect on 5/28/09PM.
Site Preparation5/26/20095/27/20095/27/2009AFAIL
DetailsClint A Smith
Correction Notice:
Provide a stabilized access for on and of traffic for the site.
Clean up all hard surfaces of all sediment and debris.
Provide access controls to eliminate off site tracking.
Provide inlet protection for storm drain on Victory Rd.
Failure to comply within the given tme frame will result in a stop work order Will re-inspect on 5/28/09PM.
BMP Violation5/26/20095/26/20095/26/2009PFAIL
DetailsClint A Smith
TOld RP to meet with us tomorrow at 9:00am to go over all erosion ans sediment control provision that need to be impliments per there ESC plan approved by the city. Also need to post the ESC sign. Will re-inspect on 5/27/09 AM.