Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberESC09-00113
StatusFinaled
Name JUSTIN REYNOLDS
Site Address 645 S ARCHSTONE WAY
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/14/200910/15/200910/15/2009APASS
DetailsTom Arcoraci
Random Inspection10/14/200910/14/200910/14/2009PPASS
DetailsTom Arcoraci
General Inspection10/14/200910/14/200910/14/2009PPASS
DetailsBob Reichert
looked ok, still working on
Random Inspection6/26/20096/26/20096/26/2009PPART
DetailsTom Arcoraci
incomplete
Random Inspection6/25/20096/25/20096/25/2009PPART
DetailsTom Arcoraci
General Inspection5/18/20096/18/20096/19/2009AFAIL
DetailsClint A Smith
Verbal to RP:
obtain permit for the area to the east of project where stockpile of materail and debris. Must be complete by 6/24/09PM.
Will re-inspect on 6/25/09AM.
Random Inspection6/5/20096/5/20096/5/2009PPASS
DetailsClint A Smith
General Inspection5/27/20095/29/20095/29/2009APASS
DetailsClint A Smith
Random Inspection5/27/20095/27/20095/27/2009PFAIL
DetailsClint A Smith
Message to RP:
Correction Notice;
1. Clean all hard surfaces of ALL sediment and debris.
2. Consolidate all wood spoils into one pile. Not scattered throughout project area.
3. Maint or remove all siltfence along the front of project area.
4. Provide a washout pit prior to anymore concrete or mortar work and post signage.
Failure to comply within the given time frame will result in a stop work order. Will re-inspect on 5/29/09AM.
Tracking Control5/18/20095/18/20095/18/2009PFAIL
DetailsClint A Smith
Verbal to RP:
1. Clean up all trackin onto street where gravel fill is being brought in. This will be the last day of flat work.

Also discussed with RP over stabilizing stock piles on lot to the east. If stockpiles are sitting for more than 30 days temporary stabilized or not, a permit is required. RP is waiting on the go on a duplex unit on that lot. So I have given the ok for 30 days or until permit is issued for the duplex unit. Will re-inspect on this issue on 6/18/09.
BMP Violation5/12/20095/15/20095/18/2009PPASS
DetailsClint A Smith
General Inspection5/8/20095/12/20095/12/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Re-install silt fence along the front of the project area.
Provide a trash container for all trash debris generated from construction.
Clean up all hard surfaces of all seiment and debris on a daily basis. Will re-inspect on 5/15/09PM.
General Inspection4/27/20094/27/20094/27/2009APASS
DetailsMike Kinnear
sign posted site looks fine