Site Final | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 4/20/2009 | 4/20/2009 | 4/20/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 4/17/2009 | 4/17/2009 | 4/17/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 4/15/2009 | 4/15/2009 | 4/15/2009 | P | PASS |
Troy James
|
|
|
|
General Inspection | 4/7/2009 | 4/9/2009 | 4/9/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 4/7/2009 | 4/7/2009 | 4/7/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to IRP: 1. Move porter pottie off of the right a way and out of the gutterpan. 2. Sweep up access to lot of all sediment and debris. Complete prior to the storm event on 04/08/09PM. Will re-inspect on 04/09/09AM.
|
Random Inspection | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 4/1/2009 | 4/1/2009 | 4/1/2009 | A | PART |
Tom Arcoraci
|
|
|
needs to sweep track out
|