Permit Information
Permit NumberESC09-00181
StatusFinaled
Name JOE PERKINS
Site Address 200 E GOWEN RD
Project NamePERKINS OFFICE & STORAGE UNITS
Customer Number 
ePlanReview 
Description
(Perkins Office & Storage Units) (Office - Bldg 1)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/1/20109/1/20109/1/2010PPASS
DetailsJim Storey
Random Inspection6/22/20106/22/20106/22/2010PPASS
DetailsJim Storey
Random Inspection6/15/20106/16/20106/21/2010PPASS
DetailsJim Storey
landscaping in progress ok
Random Inspection4/21/20104/21/20104/21/2010APASS
DetailsJim Storey
Random Inspection4/6/20104/6/20104/6/2010APASS
DetailsBill VanDegrift
looked ok
General Inspection3/19/20103/19/20103/19/2010PPASS
DetailsBob Reichert
looked ok
General Inspection1/19/20101/19/20101/19/2010PPASS
DetailsBob Reichert
looked ok
General Inspection1/14/20101/14/20101/14/2010PPASS
DetailsBob Reichert
looked ok
General Inspection12/11/200912/11/200912/11/2009PPASS
DetailsBob Reichert
looked ok
General Inspection12/2/200912/2/200912/2/2009PPASS
DetailsJim Storey
General Inspection11/20/200911/20/200911/20/2009PPASS
DetailsBob Reichert
looked ok, did not notice esc signs, heavy equipment working
Tracking Control11/12/200911/13/200911/13/2009PPART
DetailsClint A Smith
Verbal to RP: Relocate ESC signs to the front of project where they are visable from the road.
Tracking Control11/12/200911/12/200911/12/2009PFAIL
DetailsClint A Smith
Correction Notice:
1.Clean up all sediment and debris off of all hard surfaces.
2.Maintain construction exit.
3. Post ESC sign where it is visable from Gowen Rd.
Failure to comply will result in a Stop Work Order. Will re-inspect on 11/13/09 PM
General Inspection11/9/200911/9/200911/9/2009PPASS
DetailsBob Reichert
looked ok
General Inspection11/6/200911/6/200911/6/2009PPASS
DetailsBob Reichert
looked ok
General Inspection11/4/200911/4/200911/4/2009PPASS
DetailsBob Reichert
looked ok
General Inspection10/30/200910/30/200910/30/2009PPASS
DetailsBob Reichert
looked ok, muddy, utility road crossing underway
Complaint Inspection10/27/200910/27/200910/27/2009PCANC
DetailsBob Reichert
wrong type request 370 assigned to self
General Inspection10/23/200910/23/200910/23/2009PPASS
DetailsBob Reichert
looked ok
General Inspection10/22/200910/22/200910/22/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection10/19/200910/19/200910/19/2009APASS
DetailsJim Storey
General Inspection10/16/200910/16/200910/16/2009PPASS
DetailsBob Reichert
looked ok
General Inspection9/30/20099/30/20099/30/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection8/28/20098/28/20098/28/2009PPASS
DetailsJim Storey
General Inspection8/20/20098/20/20098/20/2009PPART
DetailsBob Reichert
original esc appeared ok, 460 had contractor to add another permit
Conference8/13/20098/13/20098/13/2009ADONE
DetailsClint A Smith
Required the construction company to apply for another ESC permit due to the slope grading that occured at the north end of project. Area is on another parcel of land. They were allowed to to slope grade the area per the BOI. Will re-inspect on 8/14/09 PM.
Site Preparation8/10/20098/11/20098/11/2009APASS
DetailsClint A Smith
Have adjusted there plan and removed all perimeter controls due to the fact it is not inpeading on any waterways or sensitive areas.
Site Preparation8/10/20098/10/20098/10/2009ACANC
DetailsSteven Webb
Mistake
INSP - Stop Work Order8/10/20098/10/20098/10/2009PFAIL
DetailsSteven Webb
Sign & bmps not installed
Site Preparation7/14/20097/14/20097/14/2009 NR
DetailsClint A Smith
Work has not begun. Waiting on a start date.