Site Final | 3/18/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Dave Hannah
|
|
|
RTF
|
DOC - Permit Finaled | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 3/18/2010 | 3/18/2010 | 3/18/2010 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/20/2009 | 7/20/2009 | 7/20/2009 | P | PART |
Doug A Poedy
|
|
|
underground in the SE corner of the building please-Danny Phone #: ###-####. Ok to cover walker duct section.
|
Random Inspection | 5/22/2009 | 5/22/2009 | 5/22/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 5/20/2009 | 5/20/2009 | 5/20/2009 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 5/5/2009 | 5/14/2009 | 5/14/2009 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/5/2009 | 5/5/2009 | 5/5/2009 | P | PASS |
Bob Reichert
|
|
|
new permit , no activity
|
Site Preparation | 4/27/2009 | 5/4/2009 | 5/5/2009 | A | NR |
Clint A Smith
|
|
|
Homeowner told me that work will be begining on 5/14/09.
|
Site Preparation ESC | 4/27/2009 | 4/27/2009 | 4/27/2009 | | CANC |
Clint A Smith
|
|
|
|
Site Preparation ESC | 4/27/2009 | 4/27/2009 | 4/27/2009 | | NR |
Clint A Smith
|
|
|
|