General Inspection ESC | 6/1/2010 | 6/1/2010 | 6/1/2010 | | DONE |
Clint A Smith
|
|
|
Work is completed and area stabilized.
|
DOC - Permit Finaled | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/7/2010 | 1/8/2010 | 1/8/2010 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Still cleaning up tracking. Need to maintain the the construction exit on the west end of project.
|
Tracking Control | 1/7/2010 | 1/7/2010 | 1/7/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all track off of all three exits off of the project area. Will re-inspect on 1/8/10am.
|
Tracking Control | 4/29/2009 | 5/1/2009 | 5/1/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 4/29/2009 | 4/29/2009 | 4/29/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of all hard surfaces. Post the ESC sign at the access of stockpile . Will re-inspect 5/1/09
|
Site Preparation | 4/29/2009 | 4/29/2009 | 4/29/2009 | | CANC |
Steven Webb
|
|
|
duplication
|