Permit Information
Permit NumberESC09-00203
StatusFinaled
Name HERB DALRYMPLE
Site Address 350 S ALLUMBAUGH WAY
Project NameGrace @ Englefield Green
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection12/1/201012/1/201012/1/2010 DONE
DetailsJim Johnson
DOC - Permit Finaled12/1/201012/1/201012/1/2010PPASS
DetailsJim Johnson
Tracking Control6/11/20107/9/20107/9/2010APART
DetailsTom Arcoraci
Site Final6/11/20106/11/20106/11/2010PNR
DetailsTom Arcoraci
in progress of re-vegatation
Tracking Control6/3/20106/4/20106/4/2010PPASS
DetailsClint A Smith
Tracking Control6/3/20106/3/20106/3/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all trackiing onto Whisperwood. Will re-inspect on 6/4/2010
Random Inspection5/25/20105/25/20105/25/2010PPASS
DetailsTom Arcoraci
Random Inspection5/21/20105/21/20105/21/2010PPASS
DetailsTom Arcoraci
General Inspection5/19/20105/20/20105/20/2010APART
DetailsMike Jordan
General Inspection5/19/20105/19/20105/19/2010PPASS
DetailsTom Arcoraci
General Inspection3/26/20103/26/20103/26/2010APASS
DetailsTom Arcoraci
Conference3/22/20103/26/20103/26/2010APART
DetailsClint A Smith
Spoke with RP over ibstalliong there inlet protection per the manufactures specifications. Instaed of using wire they need to use large zip ties.
General Inspection3/24/20103/25/20103/25/2010PPASS
DetailsTom Arcoraci
General Inspection3/17/20103/24/20103/24/2010APART
DetailsTom Arcoraci
BMP Violation3/22/20103/22/20103/22/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Install a sediment barrier along the south end of project area where disturbed lot is elevated higher than the parking lot. Also install a stabilized construction access onto the disturbed area in the south end of project area. Will re-inspect on 3/26/10 for a confrence.
General Inspection3/17/20103/17/20103/17/2010PPASS
DetailsTom Arcoraci
General Inspection3/12/20103/12/20103/12/2010PPASS
DetailsTom Arcoraci
General Inspection3/11/20103/11/20103/11/2010PPASS
DetailsTom Arcoraci
General Inspection3/4/20103/4/20103/4/2010APASS
DetailsTom Arcoraci
pending fire
Random Inspection2/25/20102/25/20102/25/2010PPASS
DetailsTom Arcoraci
Random Inspection2/24/20102/24/20102/24/2010PPASS
DetailsTom Arcoraci
Random Inspection2/22/20102/22/20102/22/2010PPART
DetailsTom Arcoraci
told rp to sweep road
Random Inspection2/17/20102/18/20102/18/2010APASS
DetailsTom Arcoraci
Random Inspection2/11/20102/12/20102/12/2010PPASS
DetailsTom Arcoraci
General Inspection2/10/20102/10/20102/10/2010PPASS
DetailsTom Arcoraci
General Inspection2/3/20102/3/20102/3/2010PPASS
DetailsBob Reichert
looked ok
Random Inspection2/3/20102/3/20102/3/2010PPASS
DetailsTom Arcoraci
Random Inspection1/29/20101/29/20101/29/2010APASS
DetailsTom Arcoraci
General Inspection1/28/20101/28/20101/28/2010PPASS
DetailsBob Reichert
looked ok
General Inspection1/26/20101/26/20101/26/2010PPASS
DetailsBob Reichert
looked ok
Random Inspection1/25/20101/25/20101/25/2010PPASS
DetailsTom Arcoraci
General Inspection1/20/20101/20/20101/20/2010APASS
DetailsTom Arcoraci
Random Inspection1/19/20101/19/20101/19/2010PPASS
DetailsTom Arcoraci
General Inspection1/13/20101/13/20101/13/2010PPASS
DetailsBob Reichert
looked ok
Random Inspection1/11/20101/11/20101/11/2010PPASS
DetailsTom Arcoraci
Random Inspection12/30/200912/30/200912/30/2009APASS
DetailsTom Arcoraci
Random Inspection12/17/200912/17/200912/17/2009PPASS
DetailsTom Arcoraci
Random Inspection12/10/200912/10/200912/10/2009APASS
DetailsTom Arcoraci
Random Inspection12/4/200912/4/200912/4/2009APASS
DetailsTom Arcoraci
Tracking Control11/30/200912/2/200912/2/2009APASS
DetailsClint A Smith
Tracking Control11/30/200911/30/200911/30/2009PFAIL
DetailsClint A Smith
Verbal to RP:
1.Clean up all tracking onto the road.
2. Extend the construction exit to the north by at least 25-30ft with a geotextile fabric underneath the washed rock.
3. Maintain construction exit.
Will re-inspect on 12/2/09 AM
Random Inspection11/24/200911/24/200911/24/2009PPASS
DetailsTom Arcoraci
Conference11/17/200911/19/200911/19/2009ADONE
DetailsClint A Smith
Discussed over tracking issues and concerns. Recommended option that they could pursue to achieve the maximum extent practicalbe. Will follow up randomly next week.
Conference11/18/200911/19/200911/19/2009APASS
DetailsJim Johnson
9:30 am
Conference11/18/200911/19/200911/19/2009ACANC
DetailsJack Frank
9:30am
Conference11/18/200911/19/200911/19/2009APASS
DetailsTom Arcoraci
9:30am
Conference11/18/200911/18/200911/18/2009ACANC
DetailsJim Johnson
9:30am
Random Inspection11/16/200911/16/200911/16/2009PPASS
DetailsTom Arcoraci
General Inspection11/9/200911/9/200911/9/2009APASS
DetailsJack Frank
ok
Tracking Control10/30/200911/2/200911/2/2009PPASS
DetailsClint A Smith
Tracking Control10/29/200910/30/200910/30/2009AFAIL
DetailsClint A Smith
Message to RP:
Correction Notice:
1. Clean up all sediment and debrsi off of all hard surfaces (Street).
2. Maintain all storm drain inlet protection.
Will re-inspect on 11/2/09PM
Tracking Control10/29/200910/29/200910/29/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all tracking onto the street from the construction exit. Maintain construction exit to miniumize tacking off of construction project. Will re-inspect on 10/30/09 AM.
General Inspection10/19/200910/19/200910/19/2009APASS
DetailsJack Frank
ok
Random Inspection9/30/20099/30/20099/30/2009PPASS
DetailsTom Arcoraci
Random Inspection9/29/20099/29/20099/29/2009APASS
DetailsTom Arcoraci
Tracking Control9/24/20099/25/20099/25/2009PPASS
DetailsTom Arcoraci
Random Inspection9/24/20099/24/20099/24/2009APART
DetailsTom Arcoraci
told rp to clean up track out
General Inspection9/22/20099/22/20099/22/2009PPASS
DetailsTom Arcoraci
Site Preparation9/15/20099/15/20099/15/2009 PART
DetailsClint A Smith
Verbal to RP:
Street washing is only allowed after a street sweeper has completed its pass.